The Control System of the Elettra Booster Injector
نویسندگان
چکیده
A new injector made of a 100 MeV Linac and a 2.5 GeV booster ring is being built at ELETTRA to provide full energy injection into the storage ring in top-up mode. This project has required a novel design of the control system with the adoption of a new architecture and the use of up to date technologies, which will also be the basis of the control systems for future projects and accelerators upgrades. In this context, ELETTRA has adopted Tango as the control system software framework and has joined the Tango collaboration as a developer partner. The main aspects regarding the control system structure, the development of graphical user interfaces and the technical solutions adopted for the equipment interfaces are discussed. Use of industrial controllers for the interlock and personnel safety systems and their integration into the control system are also presented in this article. INTRODUCTION ELETTRA is the third generation synchrotron light source based in Trieste, Italy. Its present injector is an electron linear accelerator (Linac) working at a maximum energy of 1.2 GeV. During normal users operation electrons are injected at 0.9 GeV into the storage ring and ramped to 2 or 2.4 GeV depending on the users requirements. A refill is performed every 36 hours and typically lasts 40 minutes. The new injector will significantly increase machine stability and reliability and, above all, will allow for rapid refills that top-up the stored electron beam while keeping insertion devices and beamlines in operation. The full energy booster injector [1] is composed of a 100 MeV Linac pre-injector feeding a 3 Hz cycled booster synchrotron that matches the maximum energy of the storage ring, namely 2.5 GeV (Figure 1). It will be placed in the open space inside the present storage ring building. After the completion of the new injector, the existing Linac will become available for the FERMI@ELETTRA Free Electron Laser (FEL) facility [2], which is presently in the design phase. Figure 1: The ELETTRA facility with the new booster injector. ELETTRA is operating since 1992 with the original control system. VME crates with 68k CPU boards running the OS-9 operating system are used as field computers, while the operator consoles are Booster Synchrotron Linac Pre-Injector ELETTRA Storage Ring 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10 14 Oct 2005, MO3.3-1O (2005)
منابع مشابه
New Front-end Computers Based on Linux-rtai and Ppc
The ELETTRA control system front-end computers are presently based on 68k VME boards and the OS-9 operating system. In view of the construction of the new booster injector and of a smooth upgrade of the existing control system, PowerPC VME boards running Linux have been adopted. The new platform provides reliability, performance and flexibility, while the RTAI (Real Time Application Interface) ...
متن کاملطراحی و ساخت پیش تزریقگر الکترون چشمه نور ایران
Every synchrotron accelerator requires a pre-injector for primary injection of the electrons into the booster ring. The Iranian Light Source Facility (ILSF) pre-injector is a 150 MeV S-band linear accelerator with a thermionic cathode RF gun. The design of the pre-injector lattice and its beam dynamics calculation results together with the design of RF gun, alpha magnet, quadrupole magnets and ...
متن کاملNumerical investigation the effect of accumulator on reducing the pressure waves in a common rail fuel injection system of diesel engine
Pressure fluctuations during fuel injection are one of the factors that negative effect on performance of diesel engine. These fluctuations are caused by the rapid opening and closing of the nozzles and the creation of pressure waves in the fuel rail. One way to control these pressure fluctuations is to change the injector design and use an accumulator in the injector. This study is performed t...
متن کاملNsls-ii Injector System Diagnostics
The NSLS-II Injector System Diagnostics will provide instrumentation in the linac, Booster, Transfer Lines and Beam Dumps for measuring key beam parameters. These instruments will be adequate for staged commissioning of NSLS-II injectors, and will allow sufficient beam diagnostics for tune-up and top-up operations. This paper summarizes the status of the NSLS-II injector system diagnostics, foc...
متن کاملChallenges to the Fermilab Linac and Booster Accelerators*
A report on the challenges confronting the Fermilab Linac and Booster accelerators is presented. Plans to face those challenges are discussed. Historically, the Linac/Booster system has served only as an injector for the relatively low repetition rate Main Ring synchrotron. With construction of an 8 GeV target station for the 5 Hz MiniBooNE neutrino beam and requirements for rapid multi-batch i...
متن کامل