Related Projects (if any) 1. 2004 ~ present: A total of three fishery experts were dispatched to the Department of Fisheries. Following the assignment of a fishery technical adviser in 2004, a fishery administrative advisor was assigned in 2008 to assist in managing and maintaining this project. 2. 2005: One technician was dispatched to receive training in freezer maintenance in Japan. In addition to the ordinal training, the technician had the opportunity to learn how to install/maintain the actual freezer with a dispatch to Benin to observe its installation/dismantling. This was made possible thanks to the coordination between the fishery adviser and the manufacturer. 3. A fishery coordinator was dispatched to JICA Senegal office. 4. 2008~present: Four Japan Overseas Cooperation Volunteer (JOCV) were dispatched to indirectly assist in the management of Cotonou Port (specifically assisting the already established women’s fishery cooperative in micro-credit management [rural development], promoting the sales of processed products [home economics], establishing and managing a daycare center [youth activity], and obtaining fishery statistics [statistics]). 5. 1988: The first grant aid for fishery equipment was given to the Department of Fisheries. 6. 1994: The second grant aid for fishery equipment to the Department of Fisheries.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Testing for the fairness and predictive validity of research funding decisions: A multilevel multiple imputation for missing data approach using ex-ante and ex-post peer evaluation data from the Austrian science fund

It is essential for research funding organizations to ensure both the validity and fairness of the grant approval procedure. The ex-ante peer evaluation (EXANTE) of N = 8,496 grant applications submitted to the Austrian Science Fund from 1999 to 2009 was statistically analyzed. For 1,689 funded research projects an ex-post peer evaluation (EXPOST) was also available; for the rest of the grant a...

متن کامل

Uruguay: Promotion of the Small and Medium-Sized Industry

OECD sector 24030 Financial institutions of the formal financial sector BMZ project ID 1999 65 138 Project-executing agency Banco de la República Oriental del Uruguay (BROU) Consultant not applicable Year of ex-post evaluation 2006 Project appraisal (planned) Ex-post evaluation (actual) Start of implementation 01/2001 01/2001 Period of implementation no information available 33 months Investmen...

متن کامل

Ex - Post Egalitarianism ∗

In any legal system, one finds numerous rules and practices as well as constitutional provisions which are incompatible with utilitarian considerations. These rules and practices often grant benefits to an individual whose wellbeing is at risk; yet the costs of these benefits to other individuals outweigh the benefits. Thus, for instance, despite the persistent belief of economists that efficie...

متن کامل

An ex ante control chart for project monitoring using earned duration management observations

In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011