Fixing the payment system at Alvalade XXI: a case on IT project risk management
نویسنده
چکیده
This case describes the implementation and subsequent failure of an innovative system installed in the bars of Alvalade XXI, the recently built football stadium in Lisbon, Portugal. Casa XXI, the company running the bars, had entrusted the project to an IT supplier who had limited experience with large systems. During the inauguration, the system failed spectacularly creating a chaotic situation. The fiasco meant not only a financial loss, but also a blow to the reputation of the company. The management blamed the supplier for the failure. The supplier, however, claimed that the problem was not technical but organizational, that is, poor planning of operations. Subsequent tests were inconclusive and failed to restore trust. At the end of the case, the CEO is considering the possibility to switch to an alternative supplier. He also wonders what they could have done to manage the project and the associated risks more effectively. The case highlights risk and project management issues in large systems implementations. The discussion can be structured around cost/benefit analysis, risk assessment, and project management. Relevant dimensions include: company operations, project scope, degree of innovation, technology used, system architecture, supplier selection, and project organization. In addition, the case raises governance questions: Who is responsible for the project? Even if the project is outsourced, how should the roles and responsibilities be apportioned between the company and the IT supplier(s)? What mechanisms should be used to plan and execute IT projects, and control their risks? Journal of Information Technology (2007) 22, 399–409. doi:10.1057/palgrave.jit.2000116
منابع مشابه
Fixing the Payment System at Alvalade XXI
1 In August 2003, while many Europeans were heading to the beaches to mitigate the effects of the worst heat wave on record, José Eduardo Sampaio, the CEO of Casa XXI, was faced with another kind of heat. Cartão 21, the innovative payment system of Casa XXI that he had personally conceived and subcontracted, had dramatically failed on August 6 th during the high-visibility inauguration of Alval...
متن کاملQuantitative risk management in gas injection project: a case study from Oman oil and gas industry
The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interv...
متن کاملDeveloping a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System
Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...
متن کاملThe role of Real option in e-business Risk management: The case of E-treasury project
Implementing information technology projects requires a calculated process to prevent failure. At the same time application of information technology in organizations faces various potential risks. Exploring information technology environment in organizations reveals the potential risks and provides a structure for comprehensive risk management. There are various methods available for risk mana...
متن کاملDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- JIT
دوره 22 شماره
صفحات -
تاریخ انتشار 2007