The Effectiveness of the Longest Delivery Time Rule for the Flow Shop Delivery Time Problem
نویسنده
چکیده
In the flow shop delivery time problem, a set of jobs has to be processed onmmachines. Every machine has to process each one of the jobs, and every job has the same routing through the machines. The objective is to determine a sequence of the jobs on the machines so as to minimize maximum delivery completion time over all the jobs, where the delivery completion time of a job is the sum of its completion time, and the delivery time associated with that job. In this paper, we prove the asymptotic optimality of the Longest Delivery Time algorithm for the static version of this problem, and the Longest Delivery Time among Available Jobs (LDTA) algorithm for the dynamic version of this problem. In addition, we present the result of computational testing of the effectiveness of these algorithms. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 257–272, 2003.
منابع مشابه
The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System
Flow shop scheduling problem has a wide application in the manufacturing and has attracted much attention in academic fields. From other point, on time delivery of products and services is a major necessity of companies’ todays; early and tardy delivery times will result additional cost such as holding or penalty costs. In this paper, just-in-time (JIT) flow shop scheduling problem with preemp...
متن کاملAn Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria
In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...
متن کاملA Hybrid Approach for Fuzzy Just-In-Time Flow Shop Scheduling with Limited Buffers and Deteriorating Jobs
This paper investigates the problem of just-in-time permutation flow shop scheduling with limited buffers and linear job deterioration in an uncertain environment. The fuzzy set theory is applied to describe this situation. A novel mixed-integer nonlinear program is presented to minimize the weighted sum of fuzzy earliness and tardiness penalties. Due to the computational complexities, the prop...
متن کاملA Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines
In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...
متن کاملParticle swarm optimization for minimizing total earliness/tardiness costs of two-stage assembly flowshop scheduling problem in a batched delivery system
This paper considers a two-stage assembly flow shop scheduling problem. When all parts of each product are completed in the first stage, they are assembled into a final product on an assembly machine in the second stage. In order to reduce the delivery cost, completed products can be held until completion of some other products to be delivered in a same batch. The proposed problem addresses sch...