Comhordú in Coq: Documentation and Project Plan

ثبت نشده
چکیده

Of this content, the parameters and admitted theorems constitute the remaining work to do. Parameters are incomplete definitions, much like stub functions that can be written when developing software. Admitted theorems are those whose proofs have yet not been completed, or whose proofs have been scrapped due to some modifications rendering them obsolete. Conjectures are theorems statements that are assumed without proof because they are deemed obvious. It is not a priority to prove conjectures, though it would be desirable to prove them for the sake of completeness. The rest of the content is complete. Proved theorems are fully defined, albeit in terms of lower level results which themselves may not be fully defined. Completed definitions are similar to proved theorems. In fact, by the Curry-Howard isomorphism, they almost the sameexcept that Coq makes a distinction between sets and propositions. Inductive definitions are also complete, and differ from other definitions only in their definition style, which uses constructors.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Combining Reason and Authority for Code Authentication and Verification

We propose creating a general mechanism for specifying and enforcing authorization policies that rely on both reason and trust. In particular, it will support extensible software systems that employ both digitally signed code and language-based security, especially proof-carrying code. Our system will be a combination of an authorization logic based on the Binder language with a logical framewo...

متن کامل

Learning From Past; Assessment of the Post-War Reconstruction of Qasr-e-Shirin in Iran

This paper addresses the post-war reconstruction experience of Qasr-e-Shirin, Iran, in the aftermath of the Iran-Iraq war (1980-1988). Compared with the war-damaged cities in southwest Iran, western cities such as Qasr-e-Shirin lack a post-war reconstruction assessment and documentation. With an objective view, the author aims at documenting the situation of the city almost thirty years after i...

متن کامل

An Integrated Risk-Based Technique for Project Plan Selection

  Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...

متن کامل

Multi-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects

Today, the construction industry is facing intense competition and success in this competition depends on several factors. Project managers try to minimize project time and cost, carbon dioxide emission and at the same time maximizing the quality of project and its plan robustness. In this paper, study construction project scheduling considering a discrete trade-off between time, cost, quality,...

متن کامل

OF NURSING INFORMATICS ABC ’ s of Transitioning from Paper to Electronic Documentation

nterdisciplinary electronic documentation software is an unavoidable tool of the 21 century. Due to historical information technology (IT) project implementation failures within health care, the introduction of electronic documentation software products has shifted from being an IT project to an interdisciplinary collaborative venture. Interfacing multiple stakeholders has proven to be critical...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015