Integrated Workforce Planning Considering Regular and Overtime Decisions
نویسنده
چکیده
We consider the integrated workforce planning and allocation problem for a high volume manufacturing facility that operates in two non-overlapping shifts of twelve hours each day, with twenty eight shifts for a two week planing period. In such facilities, operational workforce planning is typically carried out in two steps consisting of the multishift assignments and the single-shift allocation. The multi-shift decisions balance the regular and overtime worker assignments to individual shifts based on capacity plans and worker availability during the two week planning period. The single-shift decisions ensure the worker-machine group allocations satisfy the qualification and skill-level requirements. In this paper, we present an integrated workforce planning model that makes these decisions for all the shifts during the two week planning period. Analyzing the regular and overtime allocation report provides insights in designing the cross-training programs.
منابع مشابه
An enhanced reliability-oriented workforce planning model for process industry using combined fuzzy goal programming and differential evolution approach
This paper draws on the “human reliability” concept as a structure for gaining insight into the maintenance workforce assessment in a process industry. Human reliability hinges on developing the reliability of humans to a threshold that guides the maintenance workforce to execute accurate decisions within the limits of resources and time allocations. This concept offers a worthwhile point of de...
متن کاملEffects of Human Factors on Workforce Scheduling
In today’s competitive market, most companies develop manufacturing systems that can help in cost reduction and maximum quality. Human issues are an important part of manufacturing systems, yet most companies ignore their effects on production performance. This paper aims to developing an integrated workforce planning system that incorporates the human being. Therefore, a multi-objective mixed ...
متن کاملConsidering Pricing Problem in a Dynamic and Integrated Design of Sustainable Closed-loop Supply Chain Network
Flexible and dynamic supply chain network design problem has been studied by many researchers during past years. Since integration of short-term and long-term decisions in strategic planning leads to more reliable plans, in this paper a multi-objective model for a sustainable closed-loop supply chain network design problem is proposed. The planning horizon of this model contains multiple strate...
متن کاملMathematical Models to Simultaneously Determine Overtime Requirements and Schedule Cells
The problem studied in this paper was inspired from an actual textile company. The problem is more complex than usual scheduling problems in that we compute overtime requirements and make scheduling decisions simultaneously. Since having tardy jobs is not desirable, we allow overtime to minimize the number of tardy jobs. The overall objective is to maximize profits. We present various mathemati...
متن کاملAdaptive aggregate production planning with fuzzy goal programming approach
Aggregate production planning (APP) determines the optimal production plan for the medium term planning horizon. The purpose of the APP is effective utilization of existing capacities through facing the fluctuations in demand. Recently, fuzzy approaches have been applied for APP focusing on vague nature of cost parameters. Considering the importance of coping with customer demand in different p...
متن کامل