Analyzing and exploiting the structure of the constraints in the ILP approach to the scheduling problem
نویسندگان
چکیده
|In integer linear programming (ILP), formulating a \good" model is of crucial importance to solving that model [1]. In this paper, we begin with a mathematical analysis of the structure of the assignment, timing, and resource constraints in high-level synthesis, and then evaluate the structure of the scheduling polytope described by these constraints. We then show how the structure of the constraints can be exploited to develop a well-structured ILP formulation, which can serve as a solid theoretical foundation for future improvement. As a start in that direction, we also present two methods to further tighten the formulation. The contribution of this paper is twofold: (1) it provides the rst in-depth formal analysis of the structure of the constraints, and it shows how to exploit that structure in a well-designed ILP formulation, and (2) it shows how to further improve a well-structured formulation by adding new valid inequalities.
منابع مشابه
A New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm
This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...
متن کاملCockpit Crew Pairing Problem in Airline Scheduling: Shortest Path with Resources Constraints Approach
Increasing competition in the air transport market has intensified active airlines’ efforts to keep their market share by attaching due importance to cost management aimed at reduced final prices. Crew costs are second only to fuel costs on the cost list of airline companies. So, this paper attempts to investigate the cockpit crew pairing problem. The set partitioning problem has been used for ...
متن کاملIntegrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach
Through the lens of supply chain management, integrating process planning decisions and scheduling plans becomes an issue of great challenge and importance. Dealing with the problem paves the way to devising operation schedules with minimum makespan; considering the flexible process sequences, it can be viewed as a fundamental tool for achieving the scheme, too. To deal with this integration, t...
متن کاملA new approach in graph- based integrated production and distribution scheduling for perishable products
This study is concerned with how the quality of perishable products can be improved by shortening the time interval between production and distribution. As special types of food such as dairy products decay fast, the integration of production and distribution scheduling (IPDS) is investigated. An integrated scheduling of both processes improves the performance and costs because the separated sc...
متن کاملThe preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IEEE Trans. VLSI Syst.
دوره 2 شماره
صفحات -
تاریخ انتشار 1994