Minimising total tardiness in the m-machine flowshop problem: A review and evaluation of heuristics and metaheuristics
نویسندگان
چکیده
In this work, a review and comprehensive evaluation of heuristics and metaheuristics for the m-machine flowshop scheduling problem with the objective of minimising total tardiness is presented. Published reviews about this objective usually deal with a single machine or parallel machines and no recent methods are compared. Moreover, the existing reviews do not use the same benchmark of instances and the results are difficult to reproduce and generalise. We have implemented a total of 40 different heuristics and metaheuristics and we have analysed their performance under the same benchmark of instances in order to make a global and fair comparison. In this comparison, we study from the classical priority rules to the most recent tabu search, simulated annealing and genetic algorithms. In the evaluations we use the experimental design approach and careful statistical analyses to validate the effectiveness of the different methods tested. The results allow us to clearly identify the state-of-the-art methods. 2006 Elsevier Ltd. All rights reserved.
منابع مشابه
Minimizing Total Weighted Tardiness in a Flexible Flowshop Environment Considering Batch Processing Machines
Scheduling in production environments is used as a competitive tool to improve efficiency and respond to customer requests. In this paper, a scheduling problem is investigated in a three-stage flexible flowshop environment with the consideration of blocking and batch processing. This problem has been inspired by the charging and packaging line of a large battery manufacturer. In this environmen...
متن کاملMILP models and valid inequalities for the two-machine permutation flowshop scheduling problem with minimal time lags
In this paper, we consider the problem of scheduling on two-machine permutation flowshop with minimal time lags between consecutive operations of each job. The aim is to find a feasible schedule that minimizes the total tardiness. This problem is known to be NP-hard in the strong sense. We propose two mixed-integer linear programming (MILP) models and two types of valid inequalities which aim t...
متن کاملDevelopment of a Set of Algorithms for the Multi-Project Scheduling Problems
In this paper, the problem of determining the best schedule for a set of projects has been modeled in the form of a generalized tardiness flowshop (GTF) problem. We develop a set of heuristic algorithms for minimizing the total tardiness of jobs in a GTF problem. In the generalized version of tardiness flowshop problems, a job is considered to be a collection of operations and there is a due da...
متن کاملA Set of Algorithms for Solving the Generalized Tardiness Flowshop Problems
This paper considers the problem of scheduling n jobs in the generalized tardiness flow shop problem with m machines. Seven algorithms are developed for finding a schedule with minimum total tardiness of jobs in the generalized flow shop problem. Two simple rules, the shortest processing time (SPT), and the earliest due date (EDD) sequencing rules, are modified and employed as the core of seque...
متن کاملParticle swarm optimization for minimizing total earliness/tardiness costs of two-stage assembly flowshop scheduling problem in a batched delivery system
This paper considers a two-stage assembly flow shop scheduling problem. When all parts of each product are completed in the first stage, they are assembled into a final product on an assembly machine in the second stage. In order to reduce the delivery cost, completed products can be held until completion of some other products to be delivered in a same batch. The proposed problem addresses sch...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & OR
دوره 35 شماره
صفحات -
تاریخ انتشار 2008