A Genetic Approach to the Truck Backer Upper Problem and the Inter-twined Spiral Problem

نویسنده

  • John R. Koza
چکیده

Neural networks are a biologically motivated problem-solving paradigm that has proven successful in robustly solving a variety of problems. This paper describes another biologically motivated paradigm, namely genetic programming, which can also solve a variety of problems. This paper explains genetic programming and applies it to two well-known benchmark problems from the field of neural networks. The truck backer upper problem is a multi-dimensional control problem and the inter-twined spirals problem is a challenging classification problem.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An application of the temporal difference algorithm to the truck backer-upper problem

We use a reinforcement learning approach to learn a real world control problem, the truck backer-upper problem. In this problem, a tractor trailer truck must be backed into a loading dock from an arbitrary location and orientation. Our approach uses the temporal difference algorithm using a neural network as the value function approximator. The novelty of this work is the simplicity of our impl...

متن کامل

A Mathematical Model to Optimize Allocation Sequence in Dispatching Problem

Truck-Shovel fleet, as the most common transportation system in open-pit mines, has a significant part of mining costs, for which optimal management can lead to substantial cost reductions. Among the available dispatch mathematical models, the multi-stage approach is well suited for allocating trucks to respected shovels in a dynamic dispatching program. However, with this kind of modeling sequ...

متن کامل

A Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint

In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...

متن کامل

Fuzzy Logic in Control: Truck Backer-Upper Problem Revisited

-Truck backer-upper problem, considered an acknowledged benchmark in nonlinear system identification, is an excellent test-bed for fuzzy control systems. Fuzzy controller, formulated on the basis of human understanding of the process or identified from measured control actions, can be regarded as an emulator of human operator. Controller design, however, may become difficult, especially if the ...

متن کامل

A Non-linear Integer Bi-level Programming Model for Competitive Facility Location of Distribution Centers

The facility location problem is a strategic decision-making for a supply chain, which determines the profitability and sustainability of its components. This paper deals with a scenario where two supply chains, consisting of a producer, a number of distribution centers and several retailers provided with similar products, compete to maintain their market shares by opening new distribution cent...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1992