Multi-objective supply planning for two-level assembly systems with stochastic lead times

نویسندگان

  • R. Sakiani
  • Seyyed M. T. Fatemi Ghomi
  • Mostafa Zandieh
چکیده

This paper considers two-level assembly systems whose lead times of components are stochastic with known discrete random distributions. In such a system, supply planning requires determination of release dates of components at level 2 in order to minimize expected holding cost and to maximize customer service. Hnaien et al. [Hnaien F, Delorme X, Dolgui A. Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times. Computers and Operations Research 2010; 37:1835–43] have recently examined this problem, trying to solve it through multi-objective genetic algorithms. However, some reconsideration in their paper is unavoidable. The main problem with Hnaien et al. proposal is their wrong mathematical model. In addition, the proposed algorithms do not work properly in large-scale instances. In the current paper, this model is corrected and solved via a new approach based on NSGA-II that is called Guided NSGA-II. This approach tries to guide search toward preferable regions in the solution space. According to the statistical analyses, the guided NSGA-II has the higher performance in comparison with the basic NSGA-II used by Hnaien et al. Moreover, the wrongly reported characteristics of the Pareto front shape provided by Hnaien et al. are modified. & 2011 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multiple objective approach for joint ordering and pricing planning problem with stochastic lead times

The integration of marketing and demand with logistics and inventories (supply side of companies) may cause multiple improvements; it can revolutionize the management of the revenue of rental companies, hotels, and airlines. In this paper, we develop a multi-objective pricing-inventory model for a retailer. Maximizing the retailer's profit and the service level are the objectives, and shorta...

متن کامل

Genetic algorithm for multi-level assembly systems under stochastic lead times

The aim of this paper is to propose tools to adapt and parameterize the Material Requirement Planning (MRP) method under lead time uncertainty. We study multi-level assembly systems with one type of finished products and several types of components. We consider that each component has a fixed unit inventory cost and the finished product has a backlogging cost per unit of time. The lead times of...

متن کامل

A two-level discount model for coordinating a decentralized supply chain considering stochastic price-sensitive demand

In this paper, a discount model is proposed to coordinate pricing and ordering decisions in a two-echelon supply chain (SC). Demand is stochastic and price sensitive while lead times are fixed. Decentralized decision making where downstream decides on selling price and order size is investigated. Then, joint pricing and ordering decisions are extracted where both members act as a single entity ...

متن کامل

A queuing-location model for in multi-product supply chain with lead time under uncertainty

Supply chain network design (SCND) problem has recently been gaining attention because an integrated management of the supply chain (SC) can reduce the unexpected/undesirable events and can affect definitely the efficiency of all the chain. A critical component of the planning activities of a manufacturing firm is the efficient design of its SC. Hence, SCND affords a sensitive platform for effi...

متن کامل

Multi-Objective Lead Time Control in Multistage Assembly Systems (TECHNICAL NOTE)

In this paper we develop a multi-objective model to optimally control the lead time of a multistage assembly system. The multistage assembly system is modeled as an open queueing network, whose service stations represent manufacturing or assembly operations. The arrival processes of the individual parts of the product, which should be assembled to each other in assembly stations, are assumed to...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 39  شماره 

صفحات  -

تاریخ انتشار 2012