Determining the Idle Time of Tiling: New Results
نویسندگان
چکیده
In the framework of perfect loop nests with uniform dependencies, tiling has been studied extensively as a source-to-source program transformation. We build upon recent results by HH ogsted, Carter, and Ferrante 10], who aim at determining the cumulated idle time spent by all processors while executing the partitioned (tiled) computation domain. We propose new, much shorter proofs of all their results and extend these in several important directions. More precisely, we provide an accurate solution for all values of the rise parameter that relates the shape of the iteration space to that of the tiles, and for all possible distributions of the tiles to processors. In contrast, the authors in 10] deal only with a limited number of cases and provide upper bounds rather than exact formulas.
منابع مشابه
An Efficient Algorithm to Allocate Parts to Cells Minimizing Total Tardiness and Idle Times
In the design of a cellular manufacturing system (CMS), one of the important problems is the cell formation in the form of machine grouping and parts family. This paper investigates an allocation of parts to common and specific cells; in such a way that each common cell is able to process all required parts. Further, this paper presents a mathematical programming model comprising such constrain...
متن کاملA Single Machine Sequencing Problem with Idle Insert: Simulated Annealing and Branch-and-Bound Methods
In this paper, a single machine sequencing problem is considered in order to find the sequence of jobs minimizing the sum of the maximum earliness and tardiness with idle times (n/1/I/ETmax). Due to the time complexity function, this sequencing problem belongs to a class of NP-hard ones. Thus, a special design of a simulated annealing (SA) method is applied to solve such a hard problem. To co...
متن کاملNo-idle time Scheduling of Open shops: Modeling and Meta-heuristic Solution Methods
In some industries as foundries, it is not technically feasible to interrupt a processor between jobs. This restriction gives rise to a scheduling problem called no-idle scheduling. This paper deals with scheduling of no-idle open shops to minimize maximum completion time of jobs, called makespan. The problem is first mathematically formulated by three different mixed integer linear programming...
متن کاملBudgetary Constraints and Idle Time Allocation in Common-Cycle Production with non-zero Setup Time
Economic lot size scheduling problem (ELSP) for a multi-product single machine system is a classical problem. This paper considers ELSP with budgetary constraint as an important aspect of such systems. In the real world situations the available funds for investment in inventory is limited. By adopting the common cycle time approach to ELSP, we obtain the optimal common cycle which minimizes the...
متن کاملOptimum Aggregate Inventory for Scheduling Multi-product Single Machine System with Zero Setup Time
In this paper we adopt the common cycle approach to economic lot scheduling problem and minimize the maximum aggregate inventory. We allow the occurrence of the idle times between any two consecutive products and consider limited capital for investment in inventory. We assume the setup times are negligible. To achieve the optimal investment in inventory we first find the idle times which minimi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Inf. Sci. Eng.
دوره 14 شماره
صفحات -
تاریخ انتشار 1997