Contractor Selection Using Integrated Goal Programming and Fuzzy ELECTRE
نویسندگان
چکیده
Outsourcing plays an important role in the success of organizations. One of the risks associated with outsourcing is inappropriate contractor selection which significantly influences the implementation of projects in terms of time, quality, and cost. In this study, we applied multi-criteria decision-making techniques in order to determine the best contractor using criteria such as reputation, offered price, and technical capacity. This study is primarily aimed at identifying important criteria of contractor selection, determining the significance of the criteria, and designing a framework for selection of the most appropriate contractor. Important criteria for selecting contractors were extracted from the literature and experts’ views were collected using questionnaire. Accordingly, six criteria were selected and their weights were determined by the application of goal programming. Finally, contractors were ranked and the best contractor was selected using fuzzy ELECTRE technique with trapezoidal fuzzy numbers. Contractor Selection Using Integrated Goal Programming and Fuzzy ELECTRE
منابع مشابه
Complex Integrated Supply Chain Planning with Multiple Modes Supply, Production and Distribution by ELECTRE Method
Strategic programming, Complex supply chain, Lean, Production programming, Suppliers selection, ELECTRE This paper represents a model of strategic programming with limited resources in a complex supply chain. The main goal of the proposed model is to increase efficiency and effectiveness of the supply chain with respect to income increases and cost decreases. Using special objective funct...
متن کاملA Grey-Based Fuzzy ELECTRE Model for Project Selection
Project selection is considered as an important problem in project management. It is multi-criteria in nature and is based on various quantitative and qualitative factors. The main purpose of this paper is to present a new rank-based method for project selection in outranking relation. According to this approach, decision alternatives were clustered in the concordance matrix and the discordance...
متن کاملSupplier’s Selection Based on Lean-Green Production Indicators by Goal Programming, Fuzzy DEMATEL and Fuzzy Quality Function Development
One of the most important parts of the green supply chain management (GSCM) is the green supplier. The green supplier selection process has a vague nature. Therefore, specific approaches, such as fuzzy, are necessary during their evaluation. On the other hand, the choice of a coherent and integrated strategy is vital to achieve lean and green production. Accordingly, the present study aimed to ...
متن کاملContractor selection in MCDM context using fuzzy AHP
Contractor selection is one of the most important problem in supply chain and itsstrongly effect on firm`s performance. Because a significant amount of auniversity`s budget assigns to construction contracts, contractor selection is animportant problem for the financial status of universities. Since Contractor selectionis a multi-criteria decision making problem (MCDM), lots of methods proposed ...
متن کاملExtension of Portfolio Selection Problem with Fuzzy Goal Programming: A Fuzzy Allocated Portfolio Approach
Recently, the economic crisis has resulted in instability in stock exchange market and this has caused high volatilities in stock value of exchanged firms. Under these conditions, considering uncertainty for a favorite investment is more serious than before. Multi-objective Portfolio selection (Return, Liquidity, Risk and Initial cost of Investment objectives) using MINMAX fuzzy goal programmin...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IJSDS
دوره 5 شماره
صفحات -
تاریخ انتشار 2014