Managing constrained capacity: a simulation study
نویسندگان
چکیده
This research focuses on the use of constrained capacity availability as a managerial decision variable in production systems. A simulation model was used to evaluate production system performance at various levels of constrained capacity before additional incremental levels of capacity were added. The results indicate that as levels of available capacity approach planned demand levels, or as demand approach capacity levels, the system performance declines. This deterioration of system performance begins at some capacity level higher than average production requirements. That is, at 100% planned capacity utilisation, system performance is considerably degraded, suggesting the need for local managerial manipulation of short-term available capacity levels. In addition, this paper reviews several issues related to constrained capacity and bottleneck management that need clarification.
منابع مشابه
A Mathematical Method for Managing the System Constraint
The goal of theory of constraints (TOC) is to maximize output, which is achieved byidentifying and managing the critically constrained resources. To manage the constraints, Goldrattproposed five focusing steps (5FS). If we increase constrained output, the output of system will beincreased. In this paper, we focus on step four of the 5FS and use the remained capacity of nonconstraintto elevate t...
متن کاملIncorporating Wind Power Generation And Demand Response into Security-Constrained Unit Commitment
Wind generation with an uncertain nature poses many challenges in grid integration and secure operation of power system. One of these operation problems is the unit commitment. Demand Response (DR) can be defined as the changes in electric usage by end-use customers from their normal consumption patterns in response to the changes in the price of electricity over time. Further, DR can be also d...
متن کاملAn Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...
متن کاملEvaluating alternative MPS development methods using MCDM and numerical simulation
One of the key elements in production planning hierarchy is master production scheduling. The aim of this study is to evaluate and compare thirteen alternative MPS development methods, including multi-objective optimization as well as twelve heuristics, in different operating conditions for multi-product single-level capacity-constrained production systems. We extract six critical criteria from...
متن کاملUsing Greedy Clustering Method to Solve Capacitated Location-Routing Problem with Fuzzy Demands
Using Greedy Clustering Method to Solve Capacitated Location-Routing Problem with Fuzzy Demands Abstract In this paper, the capacitated location routing problem with fuzzy demands (CLRP_FD) is considered. In CLRP_FD, facility location problem (FLP) and vehicle routing problem (VRP) are observed simultaneously. Indeed the vehicles and the depots have a predefined capacity to serve the customerst...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- International Journal of Internet and Enterprise Management
دوره 3 شماره
صفحات -
تاریخ انتشار 2005