In this paper we consider the single machine earliness/tardiness scheduling problem with different release dates and no unforced idle time. We present several heuristic algorithms based on the beam search technique. These algorithms include classical beam search procedures, with both priority and total cost evaluation functions, as well as the filtered and recovering variants. Both priority evaluation functions and problem-specific properties were considered for the filtering step used in the filtered and recovering beam search heuristics. Extensive preliminary tests were performed to determine appropriate values for the parameters used by each algorithm. The computational results show that the recovering beam search algorithms outperform their filtered counterparts in both solution quality and computational requirements, while the priority-based filtering procedure proves superior to the rules-based alternative. The beam search procedure with a total cost evaluation function provides very good results, but is computationally expensive and can therefore only be applied to small or medium size instances. The recovering algorithm is quite close in solution quality and is significantly faster, so it can be used to solve even large instances.
منابع مشابه
Heuristics for the Early/tardy Scheduling Problem with Release Dates
In this paper we consider the single machine earliness/tardiness scheduling problem with different release dates and no unforced idle time. We analyse the performance of several dispatch rules, a greedy procedure and a decision theory local search heuristic. The dispatch rules use a lookahead parameter whose value must be specified. We perform some experiments to determine an appropriate value ...
متن کاملMinimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem
This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...
متن کاملA fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملحل مسئله زمان بندی ماشینهای موازی نامرتبط با اهداف کل زودکرد وزنی و کل دیرکرد وزنی با استفاده از الگوریتم جستجوی پراکنده چند هدفه
The parallel machine scheduling problem is an important and difficult problem to be considered in the real-world situations. Traditionally, this problem consists of the scheduling of a set of independent jobs on parallel machines with the aim of minimizing the maximum job completion. In today's manufacturing systems, in which both early and tardy finishing of job processing are undesired, the o...
متن کاملAn exact approach to early/tardy scheduling with release dates
In this paper, we consider the single machine earliness/tardiness scheduling problem with di/erent release dates and no unforced idle time. The problem is decomposed into weighted earliness and weighted tardiness subproblems. Lower bounding procedures are proposed for each of these subproblems, and the lower bound for the original problem is the sum of the lower bounds for the two subproblems. ...