On The Architecture Scheduling Problem Of Industry 4.0
نویسندگان
چکیده
The recently emerged Fourth Industrial Revolution (Industry 4.0) is characterised by the introduction of the new Cyber-Physical System (CPS) concepts and the Internet of Things (IoT) paradigm. These new collaborating computational entities offer a broad range of opportunity to consider with a different perspective. One of the perennial problems of the manufacturing operation is the scheduling problem of typical job-shop manufacturing systems. Starting from a comparison with the typical architecture of an operating systems scheduler module, we introduce a new manufacturing scheduling architecture. Overcoming the typical Full-Hierarchical configuration defined in the ANSI/ISA 95 in favour of a SemiHeterarchical one, the introduced scheduling architecture leads to a mixture of proactive and reactive approach to the Job-shop Scheduling Problem (JSP), taking advantage from both the common decentralised and the centralised methodology. Keywords— Industry 4.0; Cyber-Physical System (CPS); JobShop Scheduling Problem; Manufacturing System; System of
منابع مشابه
Dynamic configuration and collaborative scheduling in supply chains based on scalable multi-agent architecture
Due to diversified and frequently changing demands from customers, technological advances and global competition, manufacturers rely on collaboration with their business partners to share costs, risks and expertise. How to take advantage of advancement of technologies to effectively support operations and create competitive advantage is critical for manufacturers to survive. To respond to these...
متن کاملIntegrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach
Through the lens of supply chain management, integrating process planning decisions and scheduling plans becomes an issue of great challenge and importance. Dealing with the problem paves the way to devising operation schedules with minimum makespan; considering the flexible process sequences, it can be viewed as a fundamental tool for achieving the scheme, too. To deal with this integration, t...
متن کاملSingle-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production
Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...
متن کاملA heuristic approach for multi-stage sequence-dependent group scheduling problems
We present several heuristic algorithms based on tabu search for solving the multi-stage sequence-dependent group scheduling (SDGS) problem by considering minimization of makespan as the criterion. As the problem is recognized to be strongly NP-hard, several meta (tabu) search-based solution algorithms are developed to efficiently solve industry-size problem instances. Also, two different initi...
متن کاملThe Industry 4.0 Journey: Start the Learning Journey with the Reference Architecture Model Industry 4.0
The wave of the fourth industrial revolution (Industry 4.0) is breaking on manufacturing companies. In manufacturing, one of the buzzwords of the moment is "Smart production". Smart production involves manufacturing equipment with many sensors that can generate and transmit large amounts of data. Data and information from manufacturing operations are however not used by most manufacturing compa...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2017