Quantitative and Intelligent Risk Models in Risk Management for Constructing Software Development Projects: A Review
نویسندگان
چکیده
Techniques and models for mitigating risk in software development projects classified into three categories–namely, qualitative, quantitative, and intelligent approaches. This paper is to review the quantitative and intelligent risk models in software risk management for software development projects. Indeed, this area needs more effort from scholars and researchers in quantitative and intelligent risk models to mitigate risks. As future work, we will use these hybrid models of quantitative and intelligent for mitigating software risks in cloud computing such as neural network, genetic algorithm and others artificial intelligence techniques.
منابع مشابه
Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System
Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...
متن کاملUnderground transportation system risk assessment to mitigate vulnerability against natural disasters through intelligent urban management
Quantitative and qualitative monitoring and evaluation of risk management programs will play an important role in the development of Tehran metropolitan railway transport. Considering the tectonic studies, seismic zones, land degradation and faults in north and south of Tehran, the development of underground railway lines, the assessment of the vulnerability of subway stations and the escalatio...
متن کاملRisk Management Plan in Large Urban Projects
One of the risks distinguishes urban projects from other projects is to purchase of property obstacles. The matter is of more significance in large projects. Issues with regard to possessing property obstacles, lack of accurate layout drawings for underground facilities and following probable changes in designs make it vital to have specific studies on risk management of such projects. So thi...
متن کاملDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملProbabilistic Landslide Risk Analysis and Mapping (Case Study: Chehel-Chai Watershed, Golestan Province, Iran)
The efficiency of three statistical models, AHP surface-weighted density bivariate (semi-quantitative models), stepwise multivariate regression and logistic multivariate regression models were compared in Chehel-Chai watershed in Golestan province, Iran. In current study the hazard map was prepared according to the top model of landslide hazard map. Chehel-Chai watershed is located as one of Go...