Differential evolution variants to schedule flexible assembly lines
نویسندگان
چکیده
Scarce resources such as material, labor, and equipment are to be optimized to improve the performance and lower production costs in flexible assembly lines. These resources are usually allocated optimally through the generation of schedules. In this paper, variants of a differential evolution-based algorithm are employed to schedule flexible assembly lines (FAL). The performance of the assembly line is optimized based on two performance criteria, namely the weighted sum of Earliness/Tardiness penalties and the balance of the assembly line. Different variants of the Bi-level differential evolution (BiDE) algorithms are developed to study the effects of three FAL problems. The parameters of BiDE algorithm for FAL problems are fine-tuned. The performance of the BiDE algorithm is evaluated using the datasets and the Bi-level Genetic Algorithm (BiGA) available in the literature. The experimental results show that the proposed differential evolution-based algorithm outperforms BiGA in terms of mean best fitness.
منابع مشابه
A Bi-Objective Approach to an Assembly Line Re-Balancing Problem: Model and Differential Evolution Algorithms
Assembly lines are special kinds of production systems which are of great importance in the industrial production of high quantity commodities. In many practical manufacturing systems, configuration of assembly lines is fixed and designing a new line may be incurred huge amount of costs and thereby it is not desirable for practitioners. When some changes related to market demand occur, it is wo...
متن کاملFinite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups
This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....
متن کاملThe Finite Horizon Economic Lot Scheduling in Flexible Flow Lines
This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...
متن کاملA Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines
In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...
متن کاملScheduling of Multiple Autonomous Guided Vehicles for an Assembly Line Using Minimum Cost Network Flow
This paper proposed a parallel automated assembly line system to produce multiple products having multiple autonomous guided vehicles (AGVs). Several assembly lines are configured to produce multiple products in which the technologies of machines are shared among the assembly lines when required. The transportation between the stations in an assembly line (intra assembly line) and among station...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Intelligent Manufacturing
دوره 25 شماره
صفحات -
تاریخ انتشار 2014