Reliability of the parameters of the power-duration relationship using maximal effort time-trials under laboratory conditions
نویسندگان
چکیده
The purpose of this study was to assess the reliability of critical power (CP) and the total amount of work accomplished above CP (W´) across repeated tests using ecologically valid maximal effort time-trials (TT) under laboratory conditions. After an initial incremental exercise test, ten well-trained male triathletes (age: 28.5 ± 4.7 years; body mass: 73.3 ± 7.9 kg; height: 1.80 ± 0.07 m; maximal aerobic power [MAP]: 329 ± 41 W) performed three testing sessions (Familiarization, Test I and Test II) each comprising three TT (12, 7, and 3 min with a passive recovery of 60 min between trials). CP and W´ were determined using a linear regression of power vs. the inverse of time (1/t) (P = W´ ∙ 1/t + CP). A repeated-measures ANOVA was used to detect differences in CP and W´ and reliability was assessed using the intra-class correlation coefficient (ICC) and the coefficient of variation (CoV). CP and W´ values were not significantly different between repeated tests (P = 0.171 and P = 0.078 for CP and W´, respectively). The ICC between Familiarization and Test I was r = 0.86 (CP) and r = 0.58 (W´) and between Tests I and II it was r = 0.94 (CP) and r = 0.95 (W´). The CoV notably decreased from 4.1% to 2.6% and from 25.3% to 8.2% for CP and W´, respectively. Despite the non-significant differences for both parameter estimates between Familiarization, Test I, and Test II, ICC and CoV values improved notably after the familiarization trial. Our novel findings indicate that for both, CP and W´ a familiarization trial increased reliability. It is therefore advisable to familiarize well-trained athletes when determining the power-duration relationship using TT under laboratory conditions.
منابع مشابه
Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints
In this paper, we focus on outsourcing activities optimization problem in single period setting. In some situations, capacity planning or outsourcing is a one-time event and can be modeled as a single period problem. The aim of this research is to balance the trade-off between two echelons of a supply chain consisting of a single outsourcer and a single subcontractor. Each part is composed of a...
متن کاملOptimal Adjustment of Three-Term Controller and Two-Term Compensator Performances in Hydro Power Systems for Load Frequency Control
An important issue with respect to the hydraulic power systems is the frequency stabilization. To design Load Frequency Control (LFC) with high efficiency, control parameters need to be adjusted so that the system frequency remains stable even under changeable conditions. Controlling the frequency and changes in the turbine time constant requires that three term control parameters of Proportion...
متن کاملStudy of Current and Future Meteorological Drought Conditions using the CMIP5 Model Under RCP scenarios
Reducing or increasing the climate parameters such as temperature and rainfall as a result of the climate change process, causes a variety of droughts. In this study, the effect of climate change on meteorological drought in Yazd province is investigated. For this purpose, the drought time series were determined in two historical periods (1961-2005) and the future (2017-2100) by SPI and SPEI. H...
متن کاملFamiliarisation and reliability of sprint test indices during laboratory and field assessment.
The aim of the study was to assess the reliability of sprint performance in both field and laboratory conditions. Twenty-one male (mean ± s: 19 ± 1 years, 1.79 ± 0.07 m, 77.6 ± 7.1 kg) and seventeen female team sport players (mean ± s: 21 ± 4 years, 1.68 ± 0. 07 m, 62.7 ± 4.7 kg) performed a maximal 20-metre sprint running test on eight separate occasions. Four trials were conducted on a non-mo...
متن کاملA Robust Discrete FuzzyP+FuzzyI+FuzzyD Load Frequency Controller for Multi-Source Power System in Restructuring Environment
In this paper a fuzzy logic (FL) based load frequency controller (LFC) called discrete FuzzyP+FuzzyI+FuzzyD (FP+FI+FD) is proposed to ensure the stability of a multi-source power system in restructured environment. The whale optimization algorithm (WOA) is used for optimum designing the proposed control strategy to reduce fuzzy system effort and achieve the best performance of LFC task. Further...
متن کامل