Project Risk Management in Automotive Industry . A Case Study
نویسنده
چکیده
In this paper, it is made an analysis of the current project risk management procedure followed by the Spanish Business Unit of an automotive multinational company, which manufactures steering wheels and airbag modules. Taking into account the PMI standard, different changes are established in the current procedure for the purpose of defining and implementing a project risk management procedure more useful and efficient.
منابع مشابه
Prioritization of Supply Chain Risks in Automotive Industry
Supply chains are constantly exposed to various risks. An incident or uncertain event, which has positive or negative effect on the objectives of a project, is called a risk. According to this identification, analysis and prioritization of risks may have a significant role in the success of the project. The purpose of risk management is to reduce the risks of non-achievement of these object...
متن کاملPrioritization of Supply Chain Risks in Automotive Industry
Supply chains are constantly exposed to various risks. An incident or uncertain event, which has positive or negative effect on the objectives of a project, is called a risk. According to this identification, analysis and prioritization of risks may have a significant role in the success of the project. The purpose of risk management is to reduce the risks of non-achievement of these object...
متن کاملQuantitative risk management in gas injection project: a case study from Oman oil and gas industry
The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interv...
متن کاملAn optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)
In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...
متن کاملMethodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction
The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...
متن کامل