Effects of the Distinction between Long and Short Data Grants in DOCSIS Network

نویسندگان

  • Joonyoung Jung
  • Jae-Min Ahn
چکیده

In this paper, we analyze the effects of the distinction between long and short data grants in the Data Over Cable Service Interface specifications (DOCSIS) protocol. According to DOCSIS specifications, the grants for a bandwidth request of a cable modem can be for either short or long data packets. The threshold value classifying a short and long data packet is a system operation parameter and is determined by a cable modem termination system (CMTS). We have tried to find the effect of the distinction at the point of efficiency and robustness. For this, we have checked the bit error rate and transmission efficiency for burst profiles defined in a commercial CMTS.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Prediction of Covid-19 Prevalence and Fatality Rates in Iran Using Long Short-Term Memory Neural Network

Introduction: The rapid spread of COVID-19 has become a critical threat to the world. So far, millions of people worldwide have been infected with the disease. The Covid-19 pandemic has had significant effects on various aspects of human life. Currently, prediction of the virus's spread is essential in order to be safe and make necessary arrangements. It can help control the rate of its outbrea...

متن کامل

Prediction of Covid-19 Prevalence and Fatality Rates in Iran Using Long Short-Term Memory Neural Network

Introduction: The rapid spread of COVID-19 has become a critical threat to the world. So far, millions of people worldwide have been infected with the disease. The Covid-19 pandemic has had significant effects on various aspects of human life. Currently, prediction of the virus's spread is essential in order to be safe and make necessary arrangements. It can help control the rate of its outbrea...

متن کامل

Integration of remote sensing and meteorological data to predict flooding time using deep learning algorithm

Accurate flood forecasting is a vital need to reduce its risks. Due to the complicated structure of flood and river flow, it is somehow difficult to solve this problem. Artificial neural networks, such as frequent neural networks, offer good performance in time series data. In recent years, the use of Long Short Term Memory networks hase attracted much attention due to the faults of frequent ne...

متن کامل

Effects of Trade and Financial Liberalizations on the Government Size: The Case of Iran

This paper tries to analyze effects of trade and financial liberalizations on the Iran’s government size during both long-run and short- run. Accordingly, a specification of the auto regression with distributed lag (ARDL) has been used for investigating the long run relationships between variables, and a vector correction model (VECM) has examined dynamically the short-run relationships betwe...

متن کامل

Improving Long Run Marginal Cost based Pricing along with Extended Benefit Factor method for Revenue Reconciliation of Transmission Network in Restructured Power System

Abstract : There are several methods to cover the costs of a transmission system and distribution networks. These methods are divided into either incremental or marginal approaches, which can be either long-term or short-term. The main difference between the incremental and marginal approach is how to calculate the cost of using the network. In the incremental approach, simulation and in the ma...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009