Risk Assessment for Reservoir Development Under Uncertainty
نویسندگان
چکیده
Decision analysis applied to petroleum field development is always strongly related to risk due to the uncertainties present in the process. Methodologies to quantify the impact of uncertainties are still not well established due to the amount of variables that have to be considered. The complete analysis usually depends on geological, economical and technological uncertainties that have different degrees of impact in the recovery process and may affect the decision process at different levels depending on the problem, reservoir characteristics, recovery mechanism and stage of field development. This paper shows several details of a methodology that can be applied to complex and simple reservoirs in a reasonable amount of time, discussing especially the influence of the model used to predict recovery, choice of production strategies to be used in the process, number of attributes and type of information necessary to obtain reliable results. A discussion of data integration among geology, reservoir engineering and economic analysis also is presented in order to reduce the amount of information necessary and time for the process. Some results are presented to show the advantages of automation and parallel computing to reduce the total time of the procedure where reservoir simulation is necessary for reservoir performance prediction.
منابع مشابه
A novel risk-based analysis for the production system under epistemic uncertainty
Risk analysis of production system, while the actual and appropriate data is not available, will cause wrong system parameters prediction and wrong decision making. In uncertainty condition, there are no appropriate measures for decision making. In epistemic uncertainty, we are confronted by the lack of data. Therefore, in calculating the system risk, we encounter vagueness that we have to use ...
متن کاملAn Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment
Effective project management requires reliable knowledge of cash required in different stages of project life cycle. Getting this knowledge is highly dependent on sophisticated consideration of project environment. Nature of projects and their environments are associated with uncertain conditions. In this paper, a new project cash flow assessment method based on project scheduling is proposed t...
متن کاملAssessment of Green Supplier Development Programs by a New Group Decision-Making Model Considering Possibilistic Statistical Uncertainty
The assessment and selection of green supplier development programs are an intriguing and functional research subject. This paper proposes a group decision-making approach considering possibilistic statistical concepts under uncertainty to assess green supplier development programs (GSDPs) via interval-valued fuzzy sets (IVFSs). Possibility theory is employed to regard uncertainty by IVFSs. A n...
متن کاملWell Placement Optimization under Uncertainty with CMA-ES Using the Neighborhood
In the well placement problem, as well as in many other field development optimization problems, geological uncertainty is a key source of risk affecting the viability of field development projects. Well placement problems under geological uncertainty are formulated as optimization problems in which the objective function is evaluated using a reservoir simulator on a number of possible geologic...
متن کاملA location-routing model for assessment of the injured people and relief distribution under uncertainty
Throughout history, nature has exposed humans to destructive phenomena such as earthquakes, floods, droughts, tornadoes, volcanic eruptions, and tropical and marine storms. The large scale of damages and casualties caused by natural disasters around the world has led to extensive applied research in the field of preparation and development of a comprehensive system for disaster management to mi...
متن کامل