Project Trade-Off Decisions The Gap between Reality and the Academic World
ثبت نشده
چکیده
This paper draws attention to project trade-offs significance in project management and critically reviews the current state of the knowledge on the elements to be considered and the methods to resolve trade-off decisions. Traditionally the elements to be considered in trade-offs are mainly limited to time and cost and to some extent quality or risk or the well-known Project Triangle. The trade-off methods are also dominantly developed based on mathematical models familiar in Operations Research. The limitations of traditional approaches in identifying trade-off elements; the constraints of the common methods of trade-off resolution; and the necessity of compatibility between resolution methods and features of trade-off decisions are highlighted. The researchers‟ approach and methodology to fill the gap between the realities of project trade-off decisions mainly based on the compatibility of the decision problem characteristics and capabilities of the decision making method are described.
منابع مشابه
A Hybrid Method Based on Fuzzy AHP and VIKOR for the Discrete Time-Cost-Quality Trade-off Problem
Time, cost and quality are considered as the main components in managing each project. Previous researches have mainly focused on the time-cost trade-off problems. Recently quality is considered as the most important factor in project�s success, which is influenced by time acceleration that is the less time is spent the more success is gained. In time-cost-quality trade-off problems, each act...
متن کاملDRIVING OPTIMUM TRADE-OFF BETWEEN THE BENEFITS AND COSTS OF INTERBASIN WATER TRANSFER PROJECTS
The interbasin water transfer is a remedy to mitigate the negative issues of water shortage in arid and semi-arid regions. In a water transfer project the receiving basin always benefits while, the sending basin may suffer. In this study, the project of interbasin water transfer from Dez water resources system in south-west of Iran to the central part of the contrary is investigated during...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملSome Determinants of Corporate Financing Decisions: Evidence from the Listed Companies in Tehran Stock Exchange
The aim of this empirical study is to explore the trade-off model and pecking order model of capital structure. The investigation is performed using panel data procedures for a sample of 76 firms listed in Tehran Stock Exchange during 2007-2010.The study employs OLS regression model in examining the capital structure of firms in Iran. The study employs variables reflecting differing theoretical...
متن کامل