Quality and pricing decisions for substitutable items under imperfect production process over a random planning horizon

نویسندگان

  • Manoranjan De
  • Barun Das
  • Manoranjan Maiti
چکیده

The paper determines the optimum qualities and prices of two substitute products for a manufacturer cum retailer in an imperfect production process over a random planning horizon for maximum profit. In this Economic Production Lot-size (EPL) process, items are produced simultaneously, defective production commences during the out-of-control state after the passage of some time from the commencement of production and the defective units are partially reworked. The items are substitutable to each other depending on their prices and qualities jointly or either of these two. Unit production cost depends directly on raw-material, labour and quality improvement costs and inversely on the production rate. A part of it is spent against environment protection. Here learning effect is introduced in the set-up and maintenance costs. For the whole process, the planning horizon is random with normal distribution, which is treated as a chance constraint. The models are formulated as profit maximization problems subject to a chance constraint and solved using Genetic Algorithm with Variable Populations (GAVP). The models are demonstrated numerically and the near-optimum results are presented graphically.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Joint Pricing and Inventory Control for Seasonal and Substitutable Goods Mentioning the Symmetrical and Asymmetrical Substitution

Nowadays many well-known firms may produce similar products at different prices in order to remain in the competitive environment. The price differences may cause substitution condition which motivates the customers to substitute the similar cheaper product with an expensive one leading to an environment which is known as “customer-based price driven substitution”. This research proposes a new ...

متن کامل

An inventory model for non-instantaneous deteriorating items with imperfect quality, delay in payments and time value money

In this paper, Economic Order Quantity ( ) based model for non-instantaneous deteriorating items with imperfect quality, permissible delay in payments and inflation is proposed. We adopt a time-dependent demand function. Also, the effects of time value of money are studied using the Discounted Cash Flow approach. Moreover, we assume that orders may contain a random proportion of defective items...

متن کامل

Entropic Economic Order Quantity Model for Items with Imperfect Quality Considering Constant Rate of Deterioration under Fuzzy Inflationary Conditions

It was suggested in 2004 by some researchers that it might be possible to improve production systems performance by applying the first and second laws of thermodynamics to reduce system entropy. Then these laws were used to modify the economic order quantity (EOQ) model to derive an equivalent entropic order quantity (EnOQ). Moreover the political instability or uncertainty of a country (as wel...

متن کامل

An integrated production-marketing planning model With Cubic production cost function and imperfect production process

The basic assumption in the traditional inventory model is that all outputs are perfect items. However, this assumption is too simplistic in the most real-life situations due to a natural phenomenon in a production process. From this it is deduced that the system produces non-perfects items which can be classified into four groups of perfect, imperfect, reworkable defective and non-reworkable d...

متن کامل

Optimal pricing and replenishment policies for instantaneous deteriorating items with backlogging and trade credit under inflation

In this paper we develop an economic order quantity model to investigate the optimal replenishment policies for instantaneous deteriorating items under inflation and trade credit. Demand rate is a linear function of selling price and decreases negative exponentially with time over a finite planning horizon. Shortages are allowed and partially backlogged. Under these conditions, we model the ret...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016