A Performance Study for the Multi-objective Ant Colony Optimization Algorithms on the Job Shop Scheduling Problem
نویسنده
چکیده
Most of the research on job shop scheduling problem are concerned with minimization of a single objective. However, the real world applications of job shop scheduling problems are involved in optimizing multiple objectives. Therefore, in recent years ant colony optimization algorithms have been proposed to solve job shop scheduling problems with multiple objectives. In this paper, some recent multi-objective ant colony optimization algorithms are reviewed and are applied to the job shop scheduling problem by considering two, three and four objectives. Also in this study, four criteria: makespan, mean flow time, mean tardiness and mean machine idle time are considered for simultaneous optimization. Two types of models are used by changing the number of ants in a colony and each multi-objective ant colony optimization algorithm is applied to sixteen benchmark problem instances of up to 20 jobs × 5 machines, for evaluating the performances of these algorithms. A detailed analysis is performed using the performance indicators, and the experimental results have shown that the performance of some multi-objective ant colony optimization algorithms depend on the number of objectives and the number of ants.
منابع مشابه
A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)
Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...
متن کاملAn algorithm for multi-objective job shop scheduling problem
Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...
متن کاملAnt Colony Optimisation for multi-level assembly job shop scheduling
Job shop scheduling is one of the most explored areas in the last few decades. Although it is very commonly witnessed in real-life situations, very less investigation has been carried out in scheduling operations of multi-level jobs, which undergo serial, parallel, and assembly operations in an assembly job shop. In this work, some of the dispatch rules, which have best performances in scheduli...
متن کاملFlow shop Scheduling Problem with Maintenance Coordination: a New Approach
This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...
متن کاملAnt colony optimization for job shop scheduling using multi-attribute dispatching rules
This paper proposes a heuristic method based on ant colony optimization to determine the suboptimal allocation of dynamic multi-attribute dispatching rules to maximize job shop system performance (four measures were analyzed: mean flow time, max flow time, mean tardiness, and max tardiness). In order to assure high adequacy of the job shop system representation, modeling is carried out using di...
متن کامل