Construction, Operations, and Staff Training for Juvenile Confinement Facilities

نویسنده

  • David Roush
چکیده

This Bulletin is part of OJJDP’s Juvenile Accountability Incentive Block Grants (JAIBG) Best Practices Series. The basic premise underlying the JAIBG program, initially funded in fiscal year 1998, is that young people who violate the law need to be held accountable for their offenses if society is to improve the quality of life in the Nation’s communities. Holding a juvenile offender “accountable” in the juvenile justice system means that once the juvenile is determined to have committed law-violating behavior, by admission or adjudication, he or she is held responsible for the act through consequences or sanctions, imposed pursuant to law, that are proportionate to the offense. Consequences or sanctions that are applied swiftly, surely, and consistently, and are graduated to provide appropriate and effective responses to varying levels of offense seriousness and offender chronicity, work best in preventing, controlling, and reducing further law violations.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Impact of Trauma Simulation on Pre-hospital Emergency Operations Staff

Background and Purpose: Trauma is a leading cause of death and disability worldwide. Prehospital care is the first part of the trauma treatment and care system. Improving the skills of caring for trauma patients before the patient arrives at the hospital can have a significant impact on the survival of critically ill patients.Simulation enables employees to use learning, cognitive and psycholog...

متن کامل

Construction Resource Use of Two Different Types and Scales of Iowa Swine Production Facilities

As global populations and affluence rise, there is increasing demand for energy, animal protein, and construction materials. In many cases, available resource pools are insufficient to meet growing market demands, resulting in increased prices and competition for limited resources. This study evaluates key construction resources needed to build different types and scales of Iowa swine productio...

متن کامل

Construction Resource Use of Two Different Types

As global populations and affluence rise, there is increasing demand for energy, animal protein, and construction materials. In many cases, available resource pools are insufficient to meet growing market demands, resulting in increased prices and competition for limited resources. This study evaluates key construction resources needed to build different types and scales of Iowa swine productio...

متن کامل

Framework for Leadership and Training of Biosafety Level 4 Laboratory Workers

Construction of several new Biosafety Level 4 (BSL-4) laboratories and expansion of existing operations have created an increased international demand for well-trained staff and facility leaders. Directors of most North American BSL-4 laboratories met and agreed upon a framework for leadership and training of biocontainment research and operations staff. They agreed on essential preparation and...

متن کامل

Energy Delivery at Oil and Gas Wells Construction in Regions With Harsh Climate

Energy delivery at well construction in regions with hard climate is distinguished by variable demand in electric and heat power. Energy consumption of drilling equipment, production and living facilities varies greatly during the year, depending on power load charts and climate conditions. Power supply of remote well construction sites is mostly accomplished by operating autonomous power sourc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000