Assembly Lead Time Reduction in a Semiconductor Capital Equipment Plant through Improved Material
نویسنده
چکیده
Manufacturing operations were studied at a semiconductor capital equipment manufacturing plant, with an aim to reduce the production time of their longest lead time module. Preliminary analysis was done by observing the assembly and test operations on the production floor, and material handling operations at the warehouse. Detailed time studies were then performed on the assembly and test processes, to establish baseline measurements and to gather in-depth information on the value added and non-value added activities. It was found that 18% of the assembly activities were non-value added activities, 28% of which were related to material handling on the production floor. Based on the analysis a new kit design and kitting process were developed, which enabled parts to arrive from the warehouse in kits specific to each assembly procedure performed on the module. A method of indicating shortages was also proposed. The new design and process also facilitated Just-in-Time ordering and arrival of parts. The new kitting process was piloted, and based on two trial runs it was found that it reduced material handling time on the production floor by 70% and overall time spent on non-value added assembly operations was reduced by 20%. Thesis Supervisor: Stephen C. Graves Abraham Siegel Professor of Management Sciences 3 This page left blank intentionally.
منابع مشابه
Operations Improvement in a Semiconductor Capital Equipment Manufacturing Plant : Component Level and Assembly Level Inventory Management
Semiconductor capital equipment is manufactured in a high-mix and low-volume environment at Varian Semiconductor Equipment business unit of Applied Materials. Due to the demand growth over the past years, Varian has been continuously improving its operations practices to increase the factory capacity without investing additional floor space or labor shifts. A hypothesis-driven analysis is used ...
متن کاملAssembly line performance and modeling
Automobile sector forms the backbone of manufacturing sector. Vehicle assembly line is important section in automobile plant where repetitive tasks are performed one after another at different workstations. In this thesis, a methodology is proposed to reduce cycle time and time loss due to important factors like equipment failure, shortage of inventory, absenteeism, set-up, material handling, r...
متن کاملImplementation of RFID in a Low Volume High Flexibility Assembly Plant: Process Redesign
This thesis focuses on the operational improvements in a semiconductor equipment manufacturing company (Varian Semiconductor Equipment Associates). The company faces challenges of highly fluctuating demand as well as complex and highly customized assembly, which lead to problems such as lead time control and components tracking at multiple manufacturing stages. The goal of the project is to pro...
متن کاملImproving the performance measurement using overall equipment effectiveness in an automotive industry
Considering the present business competitive scenario, the automotive industry is under pressure to achieve higher productivity. A high level of performance and quality standard could be achieved through improving the Overall Equipment Effectiveness (OEE) of the equipment in an automotive industry. Thus, the aim of this study is to investigate the performance measurement through OEE theory in a...
متن کاملImproving Performance of Mining Equipment Through Enhancement of Speed Factor: A Case Study (Research Note)
Loading and hauling machineries are highly capital intensive equipment to procure, operate and maintain in surface mining operation. It must be borne in mind that with this huge and capital-intensive equipment, every second of its life time is absolutely important from the production and productivity point of view. As such, it is imperative to optimize the overall cycle time and speed factor of...
متن کامل