An absolute beam-charge measurement of single-bunch electron beams with a pulse width of 10 ps and shortpulsed electron beams with a pulse width of 1 ns was performed by the beam test for the KEKB injector linac using a Faraday cup. A wall-current monitor was directly recalibrated by the beam test with an error of ±2%.
منابع مشابه
A Simple Real-time Beam Tuning Program for the Kekb Injector Linac
A simple real-time beam tuning program has been developed for use at the KEK B-Factory injector linac. The program features the ability to adjust an arbitrary combination of parameters (e.g. magnet currents and RF phases) in order to optimize an arbitrary combination of monitor values (e.g. the ratio of a downstream beam current to gun current). Based on the downhill-simplex method[2][?], it re...
متن کاملPlc-based Beam Charge Interlock System for Radiation Safety in the Kekb Injector Linac
A new PLC-based beam charge interlock system is under development for radiation safety and machine protection in the KEKB injector linac. This system restricts integrated amounts of beam charges passing through several locations along the linac before they are injected into four different storage rings (KEKB ee storage rings, PF, PF-AR). The beam charges are measured using wall current monitors...
متن کاملThe Sns Beam Diagnostics Experience and Lessons Learned
The Spallation Neutron Source accelerator systems are designed to deliver a 1.0 GeV, 1.4 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an Hinjector, capable of producing one-ms-long pulses at 60 Hz repetition rate with 38 mA peak current; a 1 GeV linear accelerator; an accumulator ring; and associated transport lines. The accelera...
متن کاملThe Kekb Bucket Selection System - Recent Progress and the Plan in the near Future
The KEKB bucket selection system, which enables us to realize a variety of bunch fill-patterns in the KEKB rings, has been working well since the start of the commissioning of KEKB in Dec. 1998. Although the hardware of the system has not changed since the start of the machineoperation, its software is continuously evolving, in order to meet the requirements from the view-point of more sophisti...
متن کاملEffect of Backscattered Electrons on Electron Beam Focus
Using an induction linac, ETA-II, we are studying the interaction of a 2 kA, 6 MeV electron beam focused to a <2 mm diameter spot on high-Z foils. A focus shift was noticed when changing from 5 mil to 40 mil tantalum foil targets. This shift was subsequently attributed to the effect of a substantial fraction of the incident electron beam backscattering from the target, reducing the net beam cur...