Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence
نویسندگان
چکیده
This paper discusses a two-stage assembly-type flowshop scheduling problem with batching considerations subject to a fixed job sequence. The two-stage assembly flowshop consists of m stage-1 parallel dedicated machines and a stage-2 assembly machine which processes the jobs in batches. Four regular performance metrics, namely, the total completion time, maximum lateness, total tardiness, and number of tardy jobs, are considered. The goal is to obtain an optimal batching decision for the predetermined job sequence at stage 2. This study presents a two-phase algorithm, which is developed by coupling a problemtransformation procedure with a dynamic program. The running time of the proposed algorithm is O(mnþ n), where n is the number of jobs. Journal of the Operational Research Society (2012) 63, 839–845. doi:10.1057/jors.2011.90 Published online 21 September 2011
منابع مشابه
Particle swarm optimization for minimizing total earliness/tardiness costs of two-stage assembly flowshop scheduling problem in a batched delivery system
This paper considers a two-stage assembly flow shop scheduling problem. When all parts of each product are completed in the first stage, they are assembled into a final product on an assembly machine in the second stage. In order to reduce the delivery cost, completed products can be held until completion of some other products to be delivered in a same batch. The proposed problem addresses sch...
متن کاملA three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times
This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...
متن کاملAppling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...
متن کاملA Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- JORS
دوره 63 شماره
صفحات -
تاریخ انتشار 2012