Investing in Lead-Time Variability Reduction in a Quality-Adjusted Inventory Model with Finite-Range Stochastic Lead-Time

نویسندگان

  • Farrokh Nasri
  • M. Javad Paknejad
  • John F. Affisco
چکیده

We study the impact of the efforts aimed at reducing the lead-time variability in a quality-adjusted stochastic inventory model. We assume that each lot contains a random number of defective units. More specifically, a logarithmic investment function is used that allows investment to be made to reduce lead-time variability. Explicit results for the optimal values of decision variables as well as optimal value of the variance of lead-time are obtained. A series of numerical exercises is presented to demonstrate the use of the models developed in this paper. Initially the lead-time variance reduction model LTVR is compared to the quality-adjusted model QA for different values of initial lead-time over uniformly distributed lead-time intervals from one to sevenweeks. In all cases where investment is warranted, investment in lead-time reduction results in reduced lot sizes, variances, and total inventory costs. Further, both the reduction in lot-size and lead-time variance increase as the lead-time interval increases. Similar results are obtained when lead-time follows a truncated normal distribution. The impact of proportion of defective items was also examined for the uniform case resulting in the finding that the total inventory related costs of investing in lead-time variance reduction decrease significantly as the proportion defective decreases. Finally, the results of sensitivity analysis relating to proportion defective, interest rate, and setup cost show the lead-time variance reduction model to be quite robust and representative of practice.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production

In this article, an imperfect vendor–buyer inventory system with stochastic demand, process quality control and learning in production is investigated. It is assumed that there are learning in production and investment for process quality improvement at the vendor’s end, and lot-size dependent lead-time at the buyer’s end. The lead-time for the first batch and those for the rest of the batches ...

متن کامل

An Integrated Inventory Model with Controllable Lead time and Setup Cost Reduction for Defective and Non-Defective Items

In this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. The cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. Lead time is an important element in any inventory system. The proposed model is presents an integrated inventory model with controllable lead tim...

متن کامل

Optimal Relief Order Quantity under Stochastic Demand and Lead-time

In this paper, a newsboy model is developed under uniformly distributed lead-time and demand that is an appropriate assumption in obtaining optimal relief inventory of humanitarian disasters. It is noteworthy that limited historical data are in hand on relief operations. Hence, analytical and approximate solutions for optimal relief order quan­tity were derived. The effect of lead-time uncertai...

متن کامل

Quality improvement in an inventory model with finite-range stochastic lead times

Typically, traditional inventory models operate under the assumption of perfect quality. In this paper we modify an inventory model with finite-range stochastic lead time to allow for a random number of defective units in a lot. However, there is an extra cost for holding the defective items in the lot for the period before it is returned to the supplier. This paper also considers the option of...

متن کامل

Integrated Inventory Model with Controllable Lead Time Involving Investment for Quality Improvement in Supply Chain System

The purpose of this article is to investigate a two-echelon supply chain inventory problem consisting of a single-vendor and a single-buyer with controllable lead time and investment for quality improvements. This paper presents an integrated vendor-buyer inventory model in order to minimize the sum of the ordering cost, holding cost, setup cost, investment for quality improvement and crashing ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • JAMDS

دوره 2008  شماره 

صفحات  -

تاریخ انتشار 2008