Tractable supply chain production planning, modeling nonlinear lead time and quality of service constraints
نویسندگان
چکیده
This paper addresses the task of coordinated planning of a supply chain (SC). Work in process (WIP) in each facility participating in the SC, finished goods inventory, and backlogged demand costs are minimized over the planning horizon. In addition to the usual modeling of linear material flow balance equations, variable lead time (LT) requirements, resulting from the increasing incremental WIP as a facility’s utilization increases, are also modeled. In recognition of the emerging significance of quality of service (QoS), that is, control of stockout probability to meet demand on time, maximum stockout probability constraints are also modeled explicitly. Lead time and QoS modeling require incorporation of nonlinear constraints in the production planning optimization process. The quantification of these nonlinear constraints must capture statistics of the stochastic behavior of production facilities revealed during a time scale far shorter than the customary weekly time scale of the planning process. The apparent computational complexity of planning production against variable LT and QoS constraints has long resulted in MRP-based scheduling practices that ignore the LT and QoS impact to the plan’s detriment. The computational complexity challenge was overcome by proposing and adopting a timescale decomposition approach to production planning, where short-time-scale stochastic dynamics are modeled in multiple facility-specific subproblems that receive tentative targets from a deterministic master problem and return statistics to it. A converging and scalable iterative methodology is implemented, providing evidence that significantly lower cost production plans are achievable in a computationally tractable manner. © 2008 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.
منابع مشابه
Optimal design of cross docking supply chain networks with time-varying uncertain demands
This paper proposes an integrated network design model for a post-distribution cross-docking strategy, comprising multi product production facilities with shared production resources, capacitated cross docks with setup cost and customer zones with time windows constraints. The model is dynamic in terms of time-varying uncertain demands, whereas uncertainty is expressed with scenario approach an...
متن کاملMeta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain
In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...
متن کاملThe effect of external service quality on customer’s loyalty in hotel’s industry supply chain (Case Study: Parsian Hotels)
Service quality is a factor for measuring customer satisfaction in hotel industry. Therefore, in order to achieve competitive advantage and maintain customers, improving service quality has become an important tool in hotel industry to achieve customer satisfaction which is lead to customer loyalty. Because companies are developing close relationships with suppliers and customers. Since then th...
متن کاملMathematical Formulation and Solving of Green Closed-loop Supply Chain Planning Problem with Production, Distribution and Transportation Reliability
In this paper, developed a new multi-product, multi-period, and multi-level closed-loop green supply chain planning model under uncertain conditions. The formulated model consists of five objective functions, which minimize the cost of the supply chain, minimize the CO2 emission of transportation vehicles, maximize the reliability of manufacturing and distribution centers, maximize t...
متن کاملUsing Markov Chain to Analyze Production Lines Systems with Layout Constraints
There are some problems with estimating the time required for the manufacturing process of products, especially when there is a variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines need a precise planning to reduce volume in particular situation of lin...
متن کامل