Second Interim Report
ثبت نشده
چکیده
PREFACE This report is the second in a series from the Performance Assessment Peer Review Panel. The Panel considers each successive report as an integral part of a series. Issues that have been covered previously will not be repeated unless new information or concerns arise. In preparing this report, the Panel has directed its primary attention to the methods, data, and assumptions that have been developed or identified for the Total System Performance Assessment to be used in the Viability Assessment. The Panel's goals have been to note weaknesses that can be ameliorated through the use of more appropriate models and data, to seek clarification of the bases for certain of the analytical approaches and assumptions that have been used, and to evaluate the sensitivity analyses of alternative models and parameters and their associated uncertainties.
منابع مشابه
LEGISLATIVE REPORT 106TH CONGRESS SECOND SESSION -- INTERIM United States Catholic Conference Office of Government Liaison
متن کامل
Economic Evaluation of Emission Reductions of HFCs, PFCs and SF6 in Euro\pe
Preface On its way to its current form this report has received significant input from a considerable number of experts. The " First Interim Report " which basically dealt with emission estimates and projections has been significantly amended to also cover abatement options and associated costs. Comments on the " First Interim Report " were given by representatives of the European Commission at...
متن کاملTHE COMPARATIVE STUDY OF ANTIHYPERTENSIVE TREATMENTS (CSAT): BACKGROUNDS, METHODS, AND THE PRELIMINARY RESULTS (INTERIM REPORT)
The "Comparative Study of Antihypertensive Treatments"-CSA T is a placebo-controlled, randomized, double-blind clinical trial, with the primary objective of comparing the efficacy of different pharmacological treatments of hypertension. Drug side-effects, patient compliance, and alterations in the patients' quality of life are also compared. Subjects with mild to moderate diastolic hyperte...
متن کاملD24 Testbeds Deployment of Representative Control Algorithms -interim Report Title of the Deliverable: Testbeds Deployment of Representative Control Algorithms – Interim Report
In CRUTIAL, the deployed testbeds are composed of two platforms. The first platform is based on power electronic converters that are controlled from PCs that are interconnected over an open communication network (at K.U.Leuven). The second platform consists of power station controllers on a real-time control network, interconnected to corporate and control centre networks (at CESI RICERCA). Thi...
متن کاملCost 257 Mid-term Seminar Interim Report on Source Characterization Source Characterization in Broadband Networks
1 Preface This interim report provides an overview of results on source characterization obtained in the COST 257 Action on "Impacts of New Services on the Architecture and Performance of Broadband Networks". First, the results related to fractal traac characterization is presented. Multifractal analysis, the issue of non-stationarity and long-range dependent (LRD) traac models are discussed. T...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1997