Model-Based Project-Product Lifecycle Management and Gantt Chart Models: A Comparative Study

نویسندگان

  • Amira Sharon
  • Dov Dori
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Is There a Complete Project Plan? A Model-Based Project Planning Approach

Project planning and control are the essentials of project management. The first steps of the project planning require some knowledge of the concept of the product that the project is expected to deliver. The initial project plan, scope of work, Work Breakdown Structure, and allocation of resources rely on understanding of at least the top-level product functionality, architecture, and concept ...

متن کامل

Gantt charts: A centenary appreciation

With the proliferation of microcomputer based project management packages Gantt charts have enjoyed a revival in their use. Although Henry L. Gantt is recognized as their developer their origins and provenance are less well known. Gantt was a close associate of Frederick W. Taylor and an advocate of Scientific Management. His paper describing the use of ‘‘graphics’’ for general production plann...

متن کامل

On the Compatibility of Contemporary Project Management Tools with Software Project Management

Since around 1900, when Henry L. Gantt, a management scientist, developed a system of bar charts to graphically represent work on a time scale, project management tools have been used by project managers to assist with planning, scheduling, forecasting and controlling. In order to derive the most benefit from using a project management tool, it is necessary to define how a tool’s application is...

متن کامل

Product Structuring - the Core Discipline of Product Lifecycle Management

The product structure plays a major role in product lifecycle management. It defines the structured relationship among product items and integrates all product related information. To effectively support lifecycle management implementation, initiatives to define product structuring reference models must consider that the process that best fits a specific project may vary according to the develo...

متن کامل

A Visualization of Medical Therapy Plans Compared to Gantt and PERT Charts

Medical therapy planning shares a number of properties of project management. It is, however, different in a few very important aspects — most notably, the more complex notion of time it requires. Asbru is a language that can represent medical therapy plans in terms of time-oriented, skeletal plans. But due to its formal nature, it cannot be used directly by physicians. Therefore, we developed ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Systems Engineering

دوره 20  شماره 

صفحات  -

تاریخ انتشار 2017