Solving Resource Allocation/Scheduling Problems with Constraint Integer Programming
نویسندگان
چکیده
Constraint Integer Programming (CIP) is a generalization of mixed-integer programming (MIP) in the direction of constraint programming (CP) allowing the inference techniques that have traditionally been the core of CP to be integrated with the problem solving techniques that form the core of complete MIP solvers. In this paper, we investigate the application of CIP to scheduling problems that require resource and start-time assignments to satisfy resource capacities. The best current approach to such problems is logic-based Benders decomposition, a manual decomposition method. We present a CIP model and demonstrate that it achieves performance competitive to the decomposition while outperforming the standard MIP and CP formulations.
منابع مشابه
Yard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملHybrid Approach of Constraint Programming and Integer Programming for Solving Resource - constrained Project - scheduling Problems
Abstract—Resource –constrained project scheduling problem (RCPSP) is a well known NP hard problem. This paper proposes a hybrid approach of constraint programming (CP) and integer programming (IP) which could solve RCPSP with ideal efficiency and quality. Constraint propagation is key element of constraint programming and is widely used in cumulative resource problem (CRP). CRP can be taken as ...
متن کاملReconsidering Mixed Integer Programming and MIP-Based Hybrids for Scheduling
Despite the success of constraint programming (CP) for scheduling, the much wider penetration of mixed integer programming (MIP) technology into business applications means that many practical scheduling problems are being addressed with MIP, at least as an initial approach. Furthermore, there has been impressive and well-documented improvements in the power of generic MIP solvers over the past...
متن کاملThe preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...
متن کاملAN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK
Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...