Re-engineering materials management: A case study on an Indian refinery

نویسنده

  • Prasanta Kumar Dey
چکیده

Materials management function is always a major concern to the management of any industrial organisation as high inventory and an inefficient procurement process affect the profitability to a great extent. Problems multiply due to a very current business environment in India. Hence, existing materials planning and procurement processws and inventory management systems require a re-look with respect to a changing business environment. This study shows a radical improvement in materials management function of an Indian petroleum refinery through business process re-engineering (BPR) by analysing current processes, identifying key issues, deriving paradigm shifts and developing re-engineered processes through customer value analysis. BPR has been carried out on existing processes of `̀materials planning and procurement’’ and `̀ warehousing and surplus disposal’’. The re-engineered processes for materials management function trigger a few improvement projects that were identified by the group of executives who took part in the re-engineering exercise. Those projects were implemented in an integrated framework with the application of the state of art information technology tools. Introduction Materials costs constitute approximately 60 percent of the total working capital of any industrial organisation. There is a great deal of evidence of loss of productivity due to inefficient materials management. The common issues that are associated with materials management functions are: receiving materials before they are required, causing more inventory cost and chances of deterioration in quality; not receiving materials at the time of requirement, causing loss of productivity; incorrect materials takeoff from drawing and design document; subsequent design changes; damage/loss of items; failure on installation; selection of type of contract for specific materials procurement; vendor evaluation criteria; piling up of inventory and controlling of the same; management of surplus materials; and any one of the above or all of the above, or combinations. The research register for this journal is available at http://www.mcbup.com/research_registers The current issue and full text archive of this journal is available at http://www.emerald-library.com/ft

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development and validation of work permit system performance assessment questionnaire, a case study in an Iranian oil refinery

Background: Permit-to-work system is a process used to prevent accidents in the process industries. Evaluation and monitoring of the performance of a permit to work system reveal its inherent weaknesses and reduce accidents in process industries. Since there exists no local tool for monitoring the performance of permit-to-work system in refineries and process industries, such as petrochemicals,...

متن کامل

Cause and Effect Analysis of Risks of Refinery Developmental Turnkey Projects through System Dynamics Approach Case Study: Development Project of Third Distillation Unit and LPG (Liquefied Petroleum Gas) in Isfahan Oil Refinery

Project managers are grappling with a variety of risks today as a result of increasing complexity and dynamics of projects in different stages of project life cycle. Thus, it seems quite necessary to employ an efficient risk management process that can overcome the shortcomings of traditional methods in order to handle such complexities and reach the optimal project management. This matter is e...

متن کامل

Identification, analyzing and management of human errors in the filter man job using SHERPA method: A case study of an oil refinery

Introduction: Nowadays, despite sensitive and complex technologies, Human Error is of great importance in many work environments due to its unfortunate consequences. For this reason, to limit the impacts of human error, it is necessary to identify and find the causes. Method: The present research was a descriptive-analytic study performed in 2021. After collecting information using the task ...

متن کامل

Risk assessment of resilience engineering level and integrated resilience engineering with safety, health and environment of hospitals (case study: two selected hospitals of Faraja in 1400)

Introduction: By evaluating the level of resilience engineering and resilience engineering combined with safety, health, and environment, the priorities of medical centers to face crises are determined. Therefore, this study aimed to implement a risk assessment model with a checklist designed in a fuzzy environment. Materials and Methods: This cross-sectional study, in 2014, in two Faraja hosp...

متن کامل

Cause and Effect Analysis of Risks of Refinery Developmental Turnkey Projects through System Dynamics Approach Case Study: Development Project of Third Distillation Unit and LPG (Liquefied Petroleum Gas) in Isfahan Oil Refinery

Project managers are grappling with a variety of risks today as a result of increasing complexity and dynamics of projects in different stages of project life cycle. Thus, it seems quite necessary to employ an efficient risk management process that can overcome the shortcomings of traditional methods in order to handle such complexities and reach the optimal project management. This matter is e...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Business Proc. Manag. Journal

دوره 7  شماره 

صفحات  -

تاریخ انتشار 2001