Clinical Commissioning Policy: Teriparatide for the treatment of osteogenesis imperfecta (Adults) Reference: NHS England: 16002/P
ثبت نشده
چکیده
منابع مشابه
Clinical Commissioning Policy: Deep Brain Stimulation for Central Post Stroke Pain Reference: NHS England: 16026/P
متن کامل
Evaluation of teriparatide treatment in adults with osteogenesis imperfecta.
BACKGROUND Adults with osteogenesis imperfecta (OI) have a high risk of fracture. Currently, few treatment options are available, and bone anabolic therapies have not been tested in clinical trials for OI treatment. METHODS 79 adults with OI were randomized to receive 20 μg recombinant human parathyroid hormone (teriparatide) or placebo for 18 months in a double-blind, placebo-controlled tria...
متن کاملOsteogenesis imperfecta: from diagnosis and multidisciplinary treatment to future perspectives.
Osteogenesis imperfecta is an inherited connective tissue disorder with wide phenotypic and molecular heterogeneity. A common issue associated with the molecular abnormality is a disturbance in bone matrix synthesis and homeostasis inducing bone fragility. In very early life, this can lead to multiple fractures and progressive bone deformities, including long bone bowing and scoliosis. Multidis...
متن کاملNHS reforms in England: the implications for chemotherapy commissioning
For oncology, one of the biggest effects of the reforms to the National Health Service (NHS) in England has been the designation of systemic anticancer treatments (other than hormonal agents) as a specialised service. This means that all decisions regarding the commissioning of chemotherapy are made at the national level via NHS England (NHSE), under expert guidance from the Chemotherapy Clinic...
متن کاملWhat constitutes successful commissioning of transition from children’s to adults’ services for young people with long-term conditions and what are the challenges? An interview study
Objective We explored what constitutes successful commissioning for transition and what challenges are associated with this. We aimed: (1) to identify explicit and implicit organisational structures, processes and relationships that drive commissioning around transition; (2) to identify challenges faced by commissioners; and (3) to develop a conceptual model. Design A qualitative interview st...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2016