Rejecting jobs to Minimize Load and Maximum Flow-time

نویسندگان

  • Anamitra R. Choudhury
  • Syamantak Das
  • Naveen Garg
  • Amit Kumar
چکیده

Online algorithms are usually analyzed using the notion of competitive ratio which compares the solution obtained by the algorithm to that obtained by an online adversary for the worst possible input sequence. Often this measure turns out to be too pessimistic, and one popular approach especially for scheduling problems has been that of “resource augmentation” which was first proposed by Kalyanasundaram and Pruhs. Although resource augmentation has been very successful in dealing with a variety of objective functions, there are problems for which even a (arbitrary) constant speedup cannot lead to a constant competitive algorithm. In this paper we propose a “rejection model” which requires no resource augmentation but which permits the online algorithm to not serve an epsilon-fraction of the requests. The problems considered in this paper are in the restricted assignment setting where each job can be assigned only to a subset of machines. For the load balancing problem where the objective is to minimize the maximum load on any machine, we give O(log 1/ε)-competitive algorithm which rejects at most an ε-fraction of the jobs. For the problem of minimizing the maximum weighted flow-time, we give an O(1/ε)-competitive algorithm which can reject at most an ε-fraction of the jobs by weight. We also extend this result to a more general setting where the weights of a job for measuring its weighted flow-time and its contribution towards total allowed rejection weight are different. This is useful, for instance, when we consider the objective of minimizing the maximum stretch. We obtain an O(1/ε)-competitive algorithm in this case. Our algorithms are immediate dispatch, though they may not be immediate reject. All these problems have very strong lower bounds in the speed augmentation model. IBM Research India, New Delhi. email: [email protected] Department of Computer Science and Engg., IIT Delhi. email: {sdas, naveen, amitk}@cse.iitd.ac.in

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal Two Stages Specially Structured Flow Shop Scheduling: Minimize the Rental Cost with Independent Setup Time

One of the earliest results in flow shop scheduling theory is an algorithm given by Johnson’s [1] for scheduling jobs on two or three machines to minimize the total elapsed time whenever the processing times of jobs are random. The present paper is an attempt to develop a heuristic algorithm for two stages specially structured flow shop scheduling in which the processing times of the jobs a...

متن کامل

Heuristic Approach for Specially Structured Two Stage Flow Shop Scheduling to Minimize the Rental Cost, Processing Time, Set Up Time Are Associated with Their Probabilities Including Transportation Time and Job Weightage

The present paper is an attempt to develop a new heuristic algorithm, find the optimal sequence to minimize the utilization time of the machines and hence their rental cost for two stage specially structured flow shop scheduling under specified rental policy in which processing times and set up time are associated with their respective probabilities including transportation time. Further jo...

متن کامل

Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices

In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional ...

متن کامل

Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...

متن کامل

Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop

[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • J. Comput. Syst. Sci.

دوره 91  شماره 

صفحات  -

تاریخ انتشار 2015