A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule
نویسندگان
چکیده
Due to unreliable production facility and stochastic preventive maintenance, deriving an optimal production inventory decision in practice is very complicated. In this paper, we develop a production model for deteriorating items with stochastic preventive maintenance time and rework using the first in first out (FIFO) rule. From our literature search, no study has been done on the above problem. The problem is solved using a simple search procedure; this makes it more practical for use by industries. Two case examples using uniform and exponential distribution preventive maintenance time are applied. Examples and sensitivity analysis are conducted for each case. The results show that rework and preventive maintenance time have significant affected the total cost and the optimal production time. This provides helpful managerial insights to help management in making smart decisions. & 2012 Elsevier Ltd. All rights reserved.
منابع مشابه
An economic production model for deteriorating items and time dependent demand with rework and multiple production setups
Recently, much emphasis has given to study the control and maintenance of production inventories of the deteriorating items. Rework is one of the main issues in reverse logistic and green supply chain, since it can reduce production cost and the environmental problem. Many researchers have focused on developing rework model, but few of them have developed model for deteriorating items. Due to t...
متن کاملAn Economic Production Quantity Model for Defective Items with Sales Return Service, Scrap Items and Rework
In this model, we establish an inventory model to determine the optimal inventory replenishment scheme for the economic production quantity (EPQ) model for imperfect, deteriorating items with sales return service under multiple production and rework setup. In one cycle, production process can produces the products in m production setups and reworks the defective items in one rework setup. The c...
متن کاملIntegrating Quality and Inspection for the Optimal Lot-sizing Problem with Rework, Minimal Repair and Inspection Time
This research is derived an integrated model of economic production quantity, inspection and preventive maintenance to incorporate rework, minimal repair and inspection time for an imperfect production system. Some proportions of non-conforming items are assumed scrap before the rework process start and others are reworked. The rework process is imperfect that is a proportion of the reworked it...
متن کاملOptimal Production and Inspection Strategy with Inspection Time and Reworking for a Deteriorating Process
The paper considers an integrated production, inspection, preventive maintenance, and inventory problem and determines the optimal inspection interval, inspection frequency, and production quantity yielding the maximum unit expected profit in an imperfect production process with inspection time and reworking. When the process in an out-of-control state produces a certain percentage of non-con...
متن کاملIntegrated Inspection Planning and Preventive Maintenance for a Markov Deteriorating System Under Scenario-based Demand Uncertainty
In this paper, a single-product, single-machine system under Markovian deterioration of machine condition and demand uncertainty is studied. The objective is to find the optimal intervals for inspection and preventive maintenance activities in a condition-based maintenance planning with discrete monitoring framework. At first, a stochastic dynamic programming model whose state variable is the ...
متن کامل