An Integrated Approach for Flexible Work

نویسندگان

  • K. F. Wong
  • B. T. Low
  • Yongjie Ren
چکیده

Diierent workkow modeling methods normally emphasize diierent aspects in business process, such as activity-based method emphasizes the activity and the way to fullll the activity; while the communication-based method emphasizes the communication between the customer and the supplier. Existing workkow modeling approaches are innexible and ineeective in modeling real life business tasks. To overcome this predicament, we propose a new workkow model (namely, the Multi-Agent Workkow Model, MAWM). The model starts from our business process perspective about labor division and cooperation. It integrates the methodolody of multi-agent systems in artiicial intelligence. Three sub-models are included in MAWM. In addition to using a process sub-model to model the behavior and activities in a business process, two sub-models are used to model the organizational objects and data objects manipulated in the business process. Activity-based and communication-based methods are integrated to form the process sub-model. They are useful for modeling diierent actions in the business process.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method

In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...

متن کامل

Exact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment

This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...

متن کامل

A New model for integrated lot sizing and scheduling in flexible job shop problem

In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...

متن کامل

A Flexible Integrated Forward/ Reverse Logistics Model with Random Path-based Memetic Algorithm

Due to business and environmental issues, the efficient design of an integrated forward/reverse logistics network has recently attracted more attention from researchers. The significance of transportation cost and customer satisfaction spurs an interest in developing a flexible network design model with different delivery paths. This paper proposes a flexible mixed-integer programming model to ...

متن کامل

Risk Analysis of Operating Room Using the Fuzzy Bayesian Network Model

To enhance Patient’s safety, we need effective methods for risk management. This work aims to propose an integrated approach to risk management for a hospital system. To improve patient’s safety, we should develop flexible methods where different aspects of risk and type of information are taken into consideration. This paper proposes a fuzzy Bayesian network to model and analyze risk in the op...

متن کامل

Integrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach

Through the lens of supply chain management, integrating process planning decisions and scheduling plans becomes an issue of great challenge and importance. Dealing with the problem paves the way to devising operation schedules with minimum makespan; considering the flexible process sequences, it can be viewed as a fundamental tool for achieving the scheme, too. To deal with this integration, t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1998