Reliability-Based Preventive Maintenance of Oil Circuit Breaker subject to Competing Failure Processes

نویسندگان

  • FAIROUZ IBERRAKEN
  • RAFIK MEDJOUDJ
  • RABAH MEDJOUDJ
  • DJAMIL AISSANI
  • KLAUS DIETER HAIM
  • Fairouz Iberraken
  • Rafik Medjoudj
  • Rabah Medjoudj
  • Djamil Aissani
  • Klaus Dieter Haim
چکیده

This paper investigates technical and organizational tools to improve performances of a multi-state degraded system subject to multiple competing failure processes. The competing failure processes treated in this paper are oil insulating aging and electrical contacts wear out of high voltage oil circuit breaker. To degradation processes, is associated random shocks process highlighted by the stresses due to shortcircuit solicitations. To keep a high level of circuit breaker reliability, two policies are developed and cover reliability increasing of the downstream feeder and reliability based preventive maintenance of the item. The first policy is developed using technical and organizational measures, while the second policy is based on improvement factors method optimizing availability under threshold reliability and a maximum benefit. The results obtained using a case study allow the decision maker to reach better information, to target the equipment that reduces the performances of the system, and to practice suitable maintenance actions.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Reliability Based Optimal Preventive Maintenance Policy for High Voltage Circuit Breakers in Power Plants

  Electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. High Voltage circuit-breakers are an essential part of the power network. This study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. This mo...

متن کامل

Integrated Preventive and Predictive Maintenance Markov Model for Circuit Breakers Equipped With Condition Monitoring

The Circuit Breaker (CB) is one of the most important equipment in power systems. CB must operate reliably to protect power systems as well as to perform tasks such as load disconnection, normal interruption, and fault current interruption. Therefore, the reliable operation of CB can affect the security and stability of power network. In this paper, effects of Condition Monitoring (CM) of CB on...

متن کامل

Reliability Estimation and Preventive Maintenance for Complex Multi-component Systems Subject to Multiple Dependent Competing Failure Processes

Some complex systems experience multiple dependent competing failure processes, and many traditional approaches to reliability are inadequate or inappropriate because there are two or more dependent/correlated failure processes and multiple components subject to failure. A typical design example representative of these systems is Micro-ElectroMechanical Systems. The dependency among the failure...

متن کامل

Improvement of the Reliability of the Industrial Electric Networks

The continuity in the electric supply of the electric installations is becoming one of the main requirements of the electric supply network (generation, transmission, and distribution of the electric energy). The achievement of this requirement depends from one side on the structure of the electric network and on the other side on the avaibility of the reserve source provided to maintain the su...

متن کامل

Investigating Impacts of Sustainable Repair Time and Circuit Breaker Model on Meshed Distribution Networks Reliability Assessment

Generally, the failure rate and the repair time of system components are constant parameters in reliability assessment of electric distribution systems. A failure of component is resulted from failing in the operation or overloading. In addition, there exist cases where, the repair times of components are small and tolerable from customer point of view. Thus, tolerable repair times may be overl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013