Ecient workforce scheduling for a serial processing environment: a case study at Minneapolis Star Tribune
نویسندگان
چکیده
This paper reports work done at Star Tribune, a leading metropolitan daily newspaper in Minnesota to improve integration among pressroom, mailroom and distribution operations. This work is subsequent to that already reported in IIE Transactions, which was focused on improving press operations only during the live-runs. An improved size-forecasting model is oered which allows preparation of more precise work-force schedules suciently in advance. Several system variabilities have been reduced by identifying homogeneous subclasses, and designing tailored operations for each subclass individually, and eliminating over-design to absorb between-class variabilities. Installation of ̄ow sensors on presses has eliminated unnecessary over-production, and also allowed a better coordination between the press and the distribution operations. Installation of status sensors in equipment has allowed for collection of more reliable statistics on equipment utilizations, downtimes and so forth. They also have improved many aspects of capacity and operational planning. # 1998 Elsevier Science Ltd. All rights reserved.
منابع مشابه
A Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...
متن کاملAppling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملModified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations
In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...
متن کاملThe resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study
Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...
متن کامل