A Constraint Programming Approach to the Multi-stage Batch Scheduling Problem

نویسنده

  • L. Zeballos
چکیده

A hybrid Constraint Programming (CP) formulation able to address the multi-stage batch scheduling problem is presented. This approach handles different features found in industrial environments such as finite unit ready-times, dissimilar parallel equipment in each stage, sequence-dependent changeover times, topology constraints, forbidden job-equipment assignments, etc. Moreover, it renders good computational results with a variety of objective functions. However, the most important point about the proposed approach is its ability to handle constrained situations regarding both renewable and nonrenewable resources. When dealing with non-renewable resources, critical raw materials having more than one delivery date can be modeled. The consumption of raw materials can be described by two distinct patterns: (i) the whole amount is needed at beginning of the job demanding the raw material and (ii) the consumption occurs at a constant rate along the processing of the demanding task.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics

This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...

متن کامل

A heuristic approach for multi-stage sequence-dependent group scheduling problems

We present several heuristic algorithms based on tabu search for solving the multi-stage sequence-dependent group scheduling (SDGS) problem by considering minimization of makespan as the criterion. As the problem is recognized to be strongly NP-hard, several meta (tabu) search-based solution algorithms are developed to efficiently solve industry-size problem instances. Also, two different initi...

متن کامل

Multi-Objective Stochastic Programming in Microgrids Considering Environmental Emissions

This paper deals with day-ahead programming under uncertainties in microgrids (MGs). A two-stage stochastic programming with the fixed recourse approach was adopted. The studied MG was considered in the grid-connected mode with the capability of power exchange with the upstream network. Uncertain electricity market prices, unpredictable load demand, and uncertain wind and solar power values, du...

متن کامل

An Efficient Bi-objective Genetic Algorithm for the Single Batch-Processing Machine Scheduling Problem with Sequence Dependent Family Setup Time and Non-identical Job Sizes

This paper considers the problem of minimizing make-span and maximum tardiness simultaneously for scheduling jobs under non-identical job sizes, dynamic job arrivals, incompatible job families,and sequence-dependentfamily setup time on the single batch- processor, where split size of jobs is allowed between batches. At first, a new Mixed Integer Linear Programming (MILP) model is proposed for t...

متن کامل

Agent-based approach for cooperative scheduling

This paper studies the multi-factory production (MFP) network scheduling problem where a number of different individual factories join together to form a MFP network, in which these factories can operate more economically than operating individually. However, in such network which known as virtual production network with self-interested factories with transportation times, each individual facto...

متن کامل

A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times

This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002