Finished goods management for JIT production: New models for analysis
نویسنده
چکیده
A firm is considered that manages its internal manufacturing operations according to a just-in-time system, but maintains an inventory of finished goods as a buffer against random demands from external customers. The finished goods inventory may be analysed by the methods of classical inventory theory in order to characterize the trade-off between inventory costs and schedule stability. A model is formulated in which the supply of finished goods is replenished by a small fixed quantity each time period. The size of the replenishment quantity may be revised only at pre-specified intervals. The single-interval problem is analysed, the cost-minimizing value of the replenishment quantity for a given revision interval length is computed, and the optimal cost is characterized as a function of the revision interval length. The dynamic problem is shown to be convex, with relatively easily computed optima. Finally, alternative formulations of the problem are described and suggestions made for further research.
منابع مشابه
Analysis of interactions among the barriers to JIT production: interpretive structural modelling approach
‘Survival of the fittest’ is the reality in modern global competition. Organizations around the globe are adopting or willing to embrace just-in-time (JIT) production to reinforce the competitiveness. Even though JIT is the most powerful inventory management methodologies it is not free from barriers. Barriers derail the implementation of JIT production system. One of the most significant tasks...
متن کاملImpact of JIT on inventory to sales ratios
Just‐In‐Time (JIT) production has received a great deal of attention, worldwide, since its introduction in Japan a few decades ago. It has been well documented that some of the main benefits of JIT implementation are reduction of inventories, lead‐time reduction, and cost savings. Most of the previous research on the impact of JIT on firm performance has either been anecdotal (one‐firm studies)...
متن کاملJIT in services: a review of current practices and future directions for research
Introduction Just-in-time (JIT), as an operational philosophy, has been of great interest to manufacturers and researchers alike over the past decade. Toyota Motor Company is credited with developing and operating the approach. During the early 1970s, the application of this philosophy strengthened their competitiveness in the automobile industry. Other Japanese companies adopted the policy and...
متن کاملEnhancing Production Planning (PP) Module for Manufacturing Finished Goods and Generating A Production Schedule Using SAP Application
In modern Business world, an Organization must have a complete structure to maintain its management and system. In recent years, more and more organizations are switching to automated systems. The main challenge faced by corporate manufacturing plants is to respond to the dynamic requirements of the fast changing market. Enterprise Resource Planning (ERP) enables the users to integrate internal...
متن کاملImproving for Drum_Buffer_Rope material flow management with attention to second bottlenecks and free goods in a job shop environment
Drum–Buffer–Rope is a theory of constraints production planning methodology that operates by developing a schedule for the system’s first bottleneck. The first bottleneck is the bottleneck with the highest utilization. In the theory of constraints, any job that is not processed at the first bottleneck is referred to as a free good. Free goods do not use capacity at the first bottleneck, so very...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Int. J. Computer Integrated Manufacturing
دوره 11 شماره
صفحات -
تاریخ انتشار 1998