A Data-mining Technique for the Planning and Organization of Truck Platoons
نویسندگان
چکیده
In this paper, we introduce the problem of mining frequent sub-routes for the use of platoon driving. The problem is related to the problem of mining frequent sequences. While the problem of mining frequent sequences normally focuses on patterns with a large support, the problem of mining frequent sub-routes has to deal with a small absolute support of two or more. We will present our algorithm to find truck platoon sequential pattern (TPSpan) which is based on pattern-growth methods and solves the problem of mining frequent sub-routes in an efficient way by using so called pruning parameters. We also present experimental results about the amount of possible truck platoons based on synthetic data and about the possibility of finding truck platoons with the use of pruning parameters in context of efficiency, flexibility and reliability.
منابع مشابه
Organization and Operation of Electronically Coupled Truck Platoons on German Motorways
One opportunity to manage the increase of freight transportation and to optimize utilization of motorway capacities is the concept of truck platoons. With the aid of Advanced Driver Assistance Systems, trucks are electronically coupled keeping very short gaps (approx. 10 meters) to form truck platoons on motorways. This contributes to optimisation of traffic flow and reduction of fuel consumpti...
متن کاملModeling and Optimization of Truck-Shovel Allocation to Mining Faces in Cement Quarry
Truck and shovel are the most common raw material transportation system used in the cement quarry operations. One of the major challenges associated with the cement quarry operations is the efficient allocation of truck and shovel to the mining faces. In order to minimize the truck and shovel operating cost, subject to quantity and quality constraints, the mixed integer linear programing (MILP)...
متن کاملDevelopment of a goal programming model for optimization of truck allocation in open pit mines
Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presented by Michalakopoulos and Panagiotou is developed to determine an optimal truc...
متن کاملAn Approach for Accident Forecasting Using Fuzzy Logic Rules: A Case Mining of Lift Truck Accident Forecasting in One of the Iranian Car Manufacturers
Fuzzy Logic is one of the concepts that has created different scientific attitudes by entering into various professional fields nowadays and in some cases has made remarkable effects on the results of the practical researches. However, the existence of stochastic and uncertain situations in risk and accident field, affects the possibility of the forecasting and preventing the occurrence of the ...
متن کاملA new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost
Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...
متن کامل