An Approximation Algorithm for Solving Multistage, Stochastic, Dynamic Resource Allocation Problems with Single Period Travel Times

نویسندگان

  • Gregory A. Godfrey
  • Warren B. Powell
چکیده

We consider a stochastic version of a dynamic resource allocation problem. In this setting, reusable resources must be assigned to demands that arise randomly over time. Both resources and demands are heterogeneous, and satisfying a demand generally will change the attributes of a resource. These problems arise in eet management, personnel training and assignment, and the remnant inventory problem. We formulate the problem as a multistage dynamic program, and suggest an approximation strategy that naturally yields integer solutions, and based on experimental evidence, provides near-optimal results.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Adaptive Dynamic Programming Algorithm for Dynamic Fleet Management, II: Multiperiod Travel Times

In a companion paper (Godfrey and Powell 2002) we introduced an adaptive dynamic programming algorithm for stochastic dynamic resource allocation problems, which arise in the context of logistics and distribution, fleet management, and other allocation problems. The method depends on estimating separable nonlinear approximations of value functions, using a dynamic programming framework. That pa...

متن کامل

An Adaptive Dynamic Programming Algorithm for Dynamic Fleet Management, I: Single Period Travel Times

We consider a stochastic version of a dynamic resource allocation problem. In this setting, reusable resources must be assigned to tasks that arise randomly over time. We solve the problem using an adaptive dynamic programming algorithm that uses nonlinear functional approximations that give the value of resources in the future. Our functional approximations are piecewise linear and naturally p...

متن کامل

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

A Combined Stochastic Programming and Robust Optimization Approach for Location-Routing Problem and Solving it via Variable Neighborhood Search algorithm

The location-routing problem is one of the combined problems in the area of supply chain management that simultaneously make decisions related to location of depots and routing of the vehicles. In this paper, the single-depot capacitated location-routing problem under uncertainty is presented. The problem aims to find the optimal location of a single depot and the routing of vehicles to serve th...

متن کامل

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999