Optimal utilisation of sulphonylureas in resource-constrained settings

نویسندگان

  • Poobalan Naidoo
  • Virendra Rambiritch
  • Neil Butkow
  • Selvarajah Saman
چکیده

Sulphonylureas (SUs) are oral anti-diabetic drugs (OADs) that were introduced more than 60 years ago. Clinicians are familiar with their use and they remain extensively used. However, the SU class is associated with adverse effects of weight gain and hypoglycaemia. In addition, their effects on cardiovascular events remain contentious. Newer classes of anti-diabetic agents have been developed and these agents are weight neutral (di-peptidyl peptidase IV inhibitors), while others reduce weight (glucagon-like peptide analogues and sodium glucose co-transporter inhibitors). Furthermore, the newer agents are less likely to cause hypoglycaemia and have a potentially better cardiovascular safety profile. However, the newer agents are more costly than SUs and their long-term safety is unknown. It is therefore likely that SUs will continue to be used, and more so in resource-limited settings. One may mitigate the adverse effects of weight gain and hypoglycaemia associated with the SU class by using members within this class that are less probable to cause these adverse effects. Furthermore, the specific SU must be used at the lowest effective therapeutic dose. In patients at high risk of SU-induced hypoglycaemic episodes (frail, clinically significant renal impairment), or patients in whom hypoglycaemic episodes may have devastating effects (bus drivers), newer anti-diabetic agents may be a justifiable alternative option.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

متن کامل

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

An Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem

This paper addresses the multi-mode multi-skilled resource-constrained project scheduling problem. Activities of real world projects often require more than one skill to be accomplished. Besides, in many real-world situations, the resources are multi-skilled workforces. In presence of multi-skilled resources, it is required to determine the combination of workforces assigned to each activity. H...

متن کامل

A Preemptive multimode resource constrained project scheduling model with cash flows

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 25  شماره 

صفحات  -

تاریخ انتشار 2014