Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled
نویسندگان
چکیده
In this paper a new problem called Assembly Line Worker Assignment and Balancing Problem (ALWABP) is introduced. This problem arises in those assembly lines where we have certain limited resources available (normally workers) in which the operation time for every task is different depending on who executes the task, and where there are also some task-worker incompatibilities defined. The problem consists of providing a simultaneous solution to a double assignment: (1) tasks to stations; and (2) available workers to stations. After defining the mathematical model for this problem, a basic Branch and Bound approach with three possible search strategies and different parameters is presented. We also propose the use of a Branch and Bound-based heuristic for large problems and analyze the behaviour of both exact and heuristic methods through experimental studies. Finally the implementation of these procedures in a Sheltered Work centre for Disabled -the real environment which has inspired this researchis described. In these centres the adoption of assembly lines provide many advantages, since the traditional division of work in single tasks may become a perfect tool for making certain worker disabilities invisible. Efficiently applying this configuration helps these centres to achieve their primary aim: growth in order to provide more jobs for more disabled people, but always considering the specific limitations that the disabled workers have. In this sense this paper shows one of the possible real applications where Operations Research can help not only to get economic and productive benefits but also certain social aims.
منابع مشابه
Exact and Heuristic Methods for the Assembly Line Worker Assignment and Balancing Problem
In traditional assembly lines, it is reasonable to assume that task execution times are the same for each worker. However, in sheltered work centres for disabled this assumption is not valid: some workers may execute some tasks considerably slower or even be incapable of executing them. Worker heterogeneity leads to a problem called the assembly line worker assignment and balancing problem (ALW...
متن کاملAn algorithm for integrated worker assignment, mixed-model two-sided assembly line balancing and bottleneck analysis
This paper addresses a multi-objective mixed-model two-sided assembly line balancing and worker assignment with bottleneck analysis when the task times are dependent on the worker’s skill. This problem is known as NP-hard class, thus, a hybrid cyclic-hierarchical algorithm is presented for solving it. The algorithm is based on Particle Swarm Optimization (PSO) and Theory of Constraints (TOC) an...
متن کاملSimultaneous Multi-Skilled Worker Assignment and Mixed-Model Two-Sided Assembly Line Balancing
This paper addresses a multi-objective mathematical model for the mixed-model two-sided assembly line balancing and worker assignment with different skills. In this problem, the operation time of each task is dependent on the skill of the worker. The following objective functions are considered in the mathematical model: (1) minimizing the number of mated-stations (2), minimizing the number of ...
متن کاملOn solving the assembly line worker assignment and balancing problem via beam search
Certain types of manufacturing processes can be modelled by assembly line balancing problems. In this work we deal with a specific assembly line balancing problem that is know as the assembly line worker assignment and balancing problem (ALWABP). This problem appears in settings where tasks must be assigned to workers, and workers to work stations. Task processing times are worker specific, and...
متن کاملA cost-oriented model for multi-manned assembly line balancing problem
In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Discrete Applied Mathematics
دوره 156 شماره
صفحات -
تاریخ انتشار 2008