We handle a problem to assign the starting offsets of a collision-free schedule in a certain form called a well-formed gcd notation. Each activity in an activity set recurs with its own period. If more than one activity occurs at the same time slot, it is a collision. If a schedule can be constructed as a well-formed gcd notation, the schedule is known to be collision-free. In this paper, we introduce a well-formed gcd notation and present an algorithm to assign the starting offsets of a collision-free schedule. We also propose a restricted form of a sufficient condition for detecting a collision-free periodic schedule, which can be decided in a tractable time constraint.
منابع مشابه
ON THE EXISTENCE OF PERIODIC SOLUTIONS FOR CERTAIN NON-LINEAR DIFFERENTIAL EQUATIONS
Here we consider some non-autonomous ordinary differential equations of order n and present some results and theorems on the existence of periodic solutions for them, which are sufficient conditions, section 1. Also we include generalizations of these results to vector differential equations and examinations of some practical examples by numerical simulation, section 2. For some special cases t...
متن کاملPole Assignment Of Linear Discrete-Time Periodic Systems In Specified Discs Through State Feedback
The problem of pole assignment, also known as an eigenvalue assignment, in linear discrete-time periodic systems in discs was solved by a novel method which employs elementary similarity operations. The former methods tried to assign the points inside the unit circle while preserving the stability of the discrete time periodic system. Nevertheless, now we can obtain the location of eigenvalues ...
متن کاملA THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...
متن کاملConstruction of a surface pencil with a common special surface curve
In this study, we introduce a new type of surface curves called $D$-type curve. This curve is defined by the property that the unit Darboux vector $vec{W}_{0} $ of a surface curve $vec{r}(s)$ and unit surface normal $vec{n} $ along the curve $vec{r}(s)$ satisfy the condition $leftlangle vec{n} ,vec{W}_{0} rightrangle =text{constant}$. We point out that a $D$-type curve is a geodesic curve or an...
متن کاملJoint influence of leakage delays and proportional delays on almost periodic solutions for FCNNs
This paper deals with fuzzy cellular neural networks (FCNNs) with leakage delays and proportional delays. Applying the differential inequality strategy, fixed point theorem and almost periodic function principle, some sufficient criteria which ensure the existence and global attractivity of a unique almost periodic solution for fuzzy cellular neuralnetworks with leakage delays and p...
متن کامل