A Neuro Fuzzy Technique for Process Grain Scheduling of Parallel Jobs
نویسندگان
چکیده
Problem statement: We present development of neural network based fuzzy inference system for scheduling of parallel Jobs with the help of a real life workload data. The performance evaluation of a parallel system mainly depends on how the processes are co scheduled? Various co scheduling techniques available are First Come First Served, Gang Scheduling, Flexible Co Scheduling and Agile Algorithm Approach: In order to use a wide range of objective functions, we used a rule bases scheduling strategy. The rule system depends on scheduling results of the agile algorithm and classifies all possible scheduling states and assigns an appropriate scheduling strategy based on actual state. The rule bases were developed with the help of a real workload data. Results: With the help of rule base results, scheduling was done again, which is compared with the first come first served, gang scheduling, flexible co scheduling and agile algorithm. The results of scheduling showed the optimized results of agile algorithm with the help of neuro fuzzy optimization technique. Conclusion: The study confirmed that the Neuro Fuzzy Technique can be used as a better optimization tool for optimizing any scheduling algorithm, This optimization tool is used for agile algorithm which is further used for process grain scheduling of parallel jobs.
منابع مشابه
A Genetic Based Neuro Fuzzy Technique for Process Grain Sized Scheduling of Parallel Jobs
Problem statement: In this study, we present the development of genetic algorithm based neuro fuzzy technique for process grain sized in scheduling of parallel jobs with the help of real lIfe workload data. Approach: The study uses the rule based scheduling strategy for the scheduling and classIfies all possible scheduling strategies. The rule bases are developed with the help of the neuro fuzz...
متن کاملA bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics
This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...
متن کاملSolving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...
متن کاملSolving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...
متن کاملHybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage
In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...
متن کامل