Alternative Construction Sites Suggested by Shadow Cabinet

نویسنده

  • CAROLYN LATO
چکیده

Counterproposals to President Buell G. Gallagher's blue-prints for additional facilities have been formulated by the recently established shadow cabinet.. Student Government President Shelly 'Sachs emphasized that a meeting with President Gallagher tomorrow night will determine their "feasibility." The goal of the shadow cabinet is to retain all facilities now used by students,J&chij&ng....thejSqTjth^ Campus and Mott Hall Lawns, Sachs stated. A total of 7̂5 additional offices to accommodate 150 faculty members should be erected, Sachs concurred, to "ease the burden" of office space. Although it will be more costly, the cabinet has suggested a two story structure of 52 offices between Wagner Hall and St. Nicholas Terrace. In addition, it has proposed a complex of 14 offices east of Mott Hall for use by the English department; this area is used less frequently than the two other lawns involved, he maintained. Approximately 14 more offices could be built at the far end of the South Campus Lawn behind the tree line, Sachs continued. This would elnninate the razing of a considfsrable number # of trees, he added. The shadow cabinet also suggested an alternative to paving the Mott Hall Lawn for faculty parking. It proposed that two parking lots be, created to hold a total of 66 cars, the number now using Jasper Oval. The Wagner Hall tennis court is the suggested site of one parking lot; the second area mentioned is the tennis court opposite Cohen Library bordering President Buell G. Gallagher revealed yesterday that the original plan to admit 1,200 extra students had been shelved after other City University schools refused to assume an equitable share of the increased quotas. CU Chancellor Albert H. Bowker announced on Sept. 27 that 5,000 additional freshmen would be admitted next Fall, and Dr. Gallagher agreed to accept 1,200 at the College. When Queens set its quota at 1,500, and Brooklyn and Hunter, 300 each, Dr. Gallagher announced the College would change its plans unless the other schools accepted enough freshmen to meet' the Chancellor's goal. Feasibility studies on the construction of 80 pre-fabricated classrooms and 134 faculty offices were released yesterday by Student Government Treasurer LarryYermack. The studies were not "plans or tentative plans for construction," he emphasized, but merely survSyis of spaee"availab% tTr"acconr=modate pre-fabricated structures. Prepared two weeks ago by the College's Office of Planning and Design, the studies were made public by Dr. Gallagher, Monday, at the shadow cabinet meeting. The President told the shadow cabinet that he wants to sign contracts for construction of facilities near Shepard and Eisner Halls "as soon as possible." pose of the studies, Yermack said, was to ascertain the maximum number of structures that could 1)0 built at the CoIU'Si-o.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Assessment Optimization of Safety and Health Risks Using Fuzzy TOPSIS Technique (Case Study: Construction Sites in the South of Iran)

Introduction: Safety and health risk assessment in industries is associated with uncertainties due to the variables affecting it. Therefore, in this research, optimizing safety and health risk assessment was investigated in construction sites by combining a multi-criteria decision-making technique (TOPSIS) and a fuzzy system. In the present study, to answer this question, a new method was used ...

متن کامل

بررسی آلودگی صوتی مولد های دیزلی در فعالیت های ساختمان سازی دریکی از مناطق تهران

Introduction: Using diesel generators is necessary for activities like welding in construction sites and it is often accompanied with noise pollution. The aim of this study was to evaluate noise pollution induced by diesel generators in construction activities in one of the districts of Tehran city.   Material and Method: In this descriptive study, 14 construction sites were selected for th...

متن کامل

The Most Effective Safety Codes on Occupational Accidents Prevention in Construction Sites

Background: Rapid pace of the construction projects have led to safety negligence on the part of the contractors causing higher numbers of accidents in construction industry. Thus, over 2200 legal provisions have been established for the prevention of accidents on construction sites. Not only contractors are unable to implement all provisions, but also it is hard for regulatory bodies to implem...

متن کامل

Cause-Consequence Modeling of Occupational Accidents in Construction Sites: A Retrospective Study in Iran

Introduction: Nearly half of occupational accidents in Iran occur in construction sites. Therefore, modeling of occupational accidents in these sites is one of the solutions to design safety strategies to reduce occupational accidents in the field of construction. This study was designed and conducted with the aim of modeling the cause-consequence of accidents in construction sites. Material a...

متن کامل

Marginal CO2 abatement costs: Findings from alternative shadow price estimates for Shanghai industrial sectors

Shanghai, one of the most developed cities in China, is implementing a pilot regional carbon emission trading scheme. Estimating the marginal abatement costs of CO2 emissions for the industrial sectors covered in Shanghai's emission trading scheme provides the government and participating firms useful information for devising compliance policies. This paper employs multiple distance function ap...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012