A hybrid constraint programming approach to the log-truck scheduling problem
نویسندگان
چکیده
Scheduling problems in the forest industry have received significant attention in the recent years and have contributed many challenging applications for optimization technologies. This paper proposes a solution method based on constraint programming and mathematical programming for a log-truck scheduling problem. The problem consists of scheduling the transportation of logs between forest areas and woodmills, as well as routing the fleet of vehicles to satisfy these transportation requests. The objective is to minimize the total cost of the non-productive activities such as the waiting time of trucks and forest log-loaders and the empty driven distance of vehicles. We propose a constraint programming model to address the combined scheduling and routing problem and an integer programming model to deal with the optimization of deadheads. Both of these models are combined through the exchange of global constraints. Finally the whole approach is validated on real industrial data.
منابع مشابه
A heuristic to solve the synchronized log-truck scheduling problem
We present a synchronized routing and scheduling problem that arises in the forest industry, as a variation of the log-truck scheduling problem. It combines routing and scheduling of trucks with specific constraints related to the Canadian forestry context. This problem includes aspects such as pick-up and delivery, multiple products, inventory stock, multiple supply points and multiple demand ...
متن کاملA Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملTruck scheduling problem in a cross-docking system with release time constraint
In a supply chain, cross-docking is one of the most innovative systems for ameliorating the operational performance at distribution centers. Cross-docking is a logistics strategy in which freight is unloaded from inbound trucks and (almost) directly loaded into outbound trucks, with little or no storage in between, thus no inventory remains at the distribution center. In this study, we consider...
متن کاملSolving a Log-Truck Scheduling Problem with Constraint Programming
Scheduling problems in the forest industry have received significant attention in the recent years and have contributed many challenging applications for optimization technologies. This paper proposes a solution method based on constraint programming and mathematical programming for a log-truck scheduling problem. The problem consists of scheduling the transportation of logs between forest area...
متن کاملA New Hybrid Meta-Heuristics Approach to Solve the Parallel Machine Scheduling Problem Considering Human Resiliency Engineering
This paper proposes a mixed integer programming model to solve a non-identical parallel machine (NIPM) scheduling with sequence-dependent set-up times and human resiliency engineering. The presented mathematical model is formulated to consider human factors including Learning, Teamwork and Awareness. Moreover, processing time of jobs are assumed to be non-deterministic and dependent to their st...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Annals OR
دوره 184 شماره
صفحات -
تاریخ انتشار 2011